Continuous prestressed concrete bridge Loss of full continuity

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:oishiocean
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  The slab-girder type concrete bridge is one of the most common bridge types in practice.This type of bridge is built as cast-in-place reinforced concrete (RC) slab sitring on top of prestressed concrete (PC) girders,where the shear connectors are used to ensure full composite action between the concrete slab and girders,so they act as a unit.However,as observed from practice,the deck joints between adjoining spans have caused severe problems and concerns of bridge long-term serviceability and structural integrity (Mothe 2006).Continuous precast prestressed concrete bridges have therefore been adopted in practice in the United States to improve the bridge durability by eliminating bridge deck joints.However,concrete continuity diaphragm cracks over time due to concrete creep and shrinkage differential in the deck and girder (Mirmiran et al.
其他文献
我把嘴里最后一口牙膏泡沫吐出来的时候,又看了一眼挂在洗衣水泥池子上面的“扯历”.这样的一本“扯历”,放在任何一个稍微发达的地区大概都可以看作是一种史前遗迹,它是我妈
期刊
期刊
期刊
  Modem slender structures are subjected to high stress ranges when subjected to live load,hence higher vulnerability to fatigue failure can be assumed.Struct
会议
  As a relatively new structural performance indicator,risk has been gradually paid more attention in recent decades.Different from other commonly used struct
会议
期刊
期刊
  In the preliminary design phase of the bridge,there are many uncertainties and unforeseen factors,such as site condition,design,construction technology,oper
会议
一、公私思想的演变本年五月份以前,在贯彻中央财经统一政策时,本市工商业也与其它各地一样,曾一度遭遇不少困难,公私关系因而也就表现很不协调。当时公私双方的思想情况,在
期刊