论文部分内容阅读
交叉环线由于受线路条件影响小等优点,经常与计轴结合做为自动闭塞系统使用,尤其是在线路条件恶劣的长大隧道内,为了适用于更长的隧道,基于现有工程中应用的系统,探讨通过对通道补偿、减少功率消耗环节、升级器材以求取得更长传输距离的可能性。
Cross ring line due to the small impact of line conditions, etc., often combined with the axis as an automatic block system, especially in the tunnel conditions harsh tunnels, in order to apply to longer tunnels, based on the existing project application System to explore through the channel compensation, reduce power consumption links, upgrade equipment in order to obtain the possibility of a longer transmission distance.