摘要:随着科学技术的进步,工程项目的规模和复杂性持续增加,工程施工周期长,项目个性化强。由于工程的复杂性,就有必要实行专业化协作。项目管理工作中仍有缺陷,笔者经多年的工作经验提出相应的对策和具体的工程项目管理方法,为提高我国建筑企业的工程管理水平提供参考。
关键词:建筑工程;项目施工;管理;创新
Abstract: with the development of scientific technology, the size and the complexity of the project continues to increase, engineering construction cycle is long, the project personalized strong. Because of the complexity of the project, it is necessary to implement professional coordination. Project management work still have defects, the author after years of work experience put forward the corresponding countermeasures and specific engineering project management method, in order to improve our country building engineering management level of the enterprise to provide the reference.
Keywords: building engineering; Project construction; Management; innovation
中图分类号:TU71文献标识码:A 文章编号:
建筑工程项目作为企业施工的主战场,不仅是展示企业形象的窗口、造就和培养企业管理人才的摇篮,更是企业经济效益的源泉所在。为了确保安全、优质、按期向顾客提供产品,同时为了实现效益目标,施工企业一般都会及时组建集团指挥部、子公司项目经理部及其所属施工队的分级管理机构。实践证明,这样的管理模式在施工管理、质量监控、安全保证及资金管理等方面取得了明显的成果,但也存在管理人员冗余、机械设备和资源不能有效配置等问题。本文就建筑工程项目施工管理的发展与创新做了探索。
1建筑工程项目施工管理的内容
施工阶段就是对工程实施具体管理阶段,施工阶段也是花费时间最长,因此要面对时间带来的变化要求对工程进行全方位动态的管理。
1.1施工进度的管理
施工进度的控制内容:对以前的施工进度计划进行研究调整以及实施施工计划。
施工进度控制方法主要是规划、控制、协调。
(1)规划是指在施工项目实施的全部过程中进行施工,确定施工项目总进度控制目标和分进度控制目标,并编制其进度计划。
(2)控制是指在施工项目实施的全过程中,进行施工实际进度与施工计划进度的比较,出现偏差及时采取措施调整。
(3)协调是指协调与施工进度有关的单位、部门、和工作队之间的进度关系。
1.2质量管理
在工程开工前根据业主要求、工程的实际情况和企业的规划确定工程项目的质量目标。坚持“百年大计、质量第一”做好事前、事中、事后三环节工作,抓好质量控制。事前质量控制,指在正式施工前进行的质量控制,其控制重点是做好施工前准备工作,且施工准备工作要贯穿于施工全过程中。事中根据对影响工程质量的关键特点,关键部位及重要影响因素设质量管理点的原则,设置专人负责。建立高效灵敏的质量信息反馈系统。专职质检员、技术人员作为信息中心,负责搜集、整理和传递质量动态信息给决策机构。
1.3安全管理
确定安全生产目标:达到五无目标,即“无死亡事故,无重大伤人事故,无重大机械事故,无火灾,无中毒事故”。各专业班组认真钻研设计图纸进行技术交底,认真学习和深刻体会施工技术规范和施工安全规范。经过培训交底达到合格的职工才允许上岗操作,为安全工作顺利圆满开展打下坚实的基础。在施工过程中,建立每周一次的安全教育,由项目经理或专职安全员支持。同时在每道施工工序进行前,由专职安全员做书面的安全技术交底,各班组长带领施工人员认真贯彻落实。
1.4成本的控制
成本控制是指在项目成本的形成过程中,对生产经营所消耗的人力资源、物质资源和费用开支,进行指导、监督、调节和限制,及时纠正将要发生的和已经发生的偏差,把各项生产费用,控制在计划成本的范围之内,以保证成本目标的实现。
2.我国建筑工程施工项目管理存在的一些问题
2.1管理模式不合理
我国建筑企业经济效益不高,其主要原因是管理模式不合理,而目前我国建筑工程的管理模式是由计划经济的管理模式传承下来的,大型国有企业在这一点上体现得尤为明显。具体表现为:以行政手段和硬性指令代替科学的管理方法,建筑企业按固定建制组织生产,违背了工程建设的客观规律,使建筑施工企业无法根据工程项目的具体情况优化配置生产要素,不可避免地造成资产利用率低下。
2.2管理方法的落后
2.2.1工期制定方面
制定进度计划依靠以往积累的经验,“拍脑袋”定工期。编制方法只使用简单的横道图,而不使用先进的网络计划技术。
2.2.2人员素质方面
目前,施工项目的直接作业人员普遍存在素质不高的现象。技术人员流动性非常大,难以进行统一的技术业务培训,技术水平参差不齐,施工质量难以得到保证,因此有些技术方案难以实行,造成每个工程项目之间的质量差别非常大。
此外,一些业主在项目竣工通过验收后没有及时结算工程款。而施工单位不愿为了结算款而依据合同与业主打官司,因为施工单位担心由此得罪业主,破坏在整个施工工程中与业主结下的良好合作关系。但是,结算款往往包含了施工单位的利润,甚至还包括施工单位垫付的成本或以施工单位名义赊购的材料款。业主拖欠支付结算款严重影响了施工单位扩展壮大的时机。
2.2.3 控制方面
在工程项目的实施过程中,控制的理论和方法应用得比较少,尤其是前馈控制和日常控制没有落实到具体的应用上。量化的控制手段更是不多见,采用的控制方法随意性非常大。
2.3 组织形式不科学
2.3.1管理上高度集权
地域性公司和各工程公司没有独立经营权,易导致决策不及时,难以适应市场的变化,同时也难以调动各分公司的积极性。
2.3.2 组织机构的设计不合理
直线职能制组织结构适用于产品固定的生产制造型企业,对于市场变化快、产品具有单件性的建筑业是不适用的。
2.3.3部门设置不科学
一些建筑工程公司没有考虑新产品的开发和新事业的开拓而科学设置部门,工程公司中各部门多数按专业划分,每建设一个项目就要调动所有专业的工程公司,造成资源的浪费。
2.3.4 用工制度不灵活
由于建筑行业具有生产能力的不均衡性,在任务不饱满的情况下,企业也要承担大量固定工的工资,加重企业负担。
2.4 材料供应缺乏系统管理
在材料供应上突出的问题是不急需的材料被大量囤积,而急需的材料往往因为资金的原因不能及时进场。造成这种结果的原因是大多数建筑公司的供应缺乏系统管理,材料计划和仓储计划没有纳入进度计划体系中,材料的进场时间、数量和使用部位落实得不具体。如钢材、水泥等大宗材料,往往采取大批量进货的方式,这样既占用大量资金和场地,还容易造成材料损失和二次倒运。而且,当工程进度和工期变化时,材料供应计划难以得到相应的调整,造成大量暂时不用的材料涌入现场。由于资金被大量占用,一旦后續资金出现困难,工程项目的建设将受到影响。
3.管理方法创新
管理方法创新是项目管理有机处理和协调好工期、质量、成本多项目标的关键,是项目管理成败的重要保证。
3.1进度控制手段创新
作为进度控制来说,任何一个项目都是一个复杂的系统工程。因此,必须编制施工组织设计。只有这样才能确定一个工程项目各个阶段性的控制点,并从阶段性的成功取得最后的成功。
3.2质量管理方法创新
质量是企业的生命,企业要获得市场主要靠质量。质量控制核心是落实质量责任,严格执行ISO 9000质量管理体系标准,坚持做到时间再紧程序不超越,任务再重标准不降低,条件再差要求不放松。同时继续深入开展全面质量管理和群众性QC小组活动,为质量水平的不断提升创造条件。通过质量控制手段和管理方法的创新,实现不断创优和铸造精品工程的目标,赢得顾客满意,从而不断开拓新领域,占领新市场,最终达到市场创新的目的。
3.3成本控制措施创新
项目是成本中心,成本控制是至关重要的。“成本”是企业绩效管理的核心问题,绝大多数管理活动都是围绕成本而展开的。成本管理是全过程、全方位的管理,从投标承揽任务开始到工程竣工验交,每一个环节每一道工序都要事先预测,认真核算和监控。一个工程的成本包括很多方面,有现场成本,通过现场管理降低成本;有机械设备成本,通过缩短机械使用周期来提高效益;有材料成本,通过控制材料的质差、价差、量差来减低消耗;有劳动力成本,有效地使用劳动力,不搞人海战术,提高劳动生产率;有质量成本,通过提高产品质量来减少无效劳动;有文化成本,通过提高凝聚力来调动积极性。还有运输成本、财务管理成本、安全成本等。完善的项目合同管理也是成本控制的一项关键因素。项目部做工程,不是简单地按行政指令完成任务,而是依法履行合同。项目管理第一要重视研究合同条款,在执行合同中,要对所有的变更以函件形式备案,不能有随意性。第二要善于运用合同,尤其是要善于运用合同索赔,保护自己正当的经济权益。
3.4人本管理思路创新
项目管理必须始终坚持以人为本的思路不动摇。无论是ISO9000质量管理体系所倡导的八大质量管理原则,还是ISO 14000环保管理体系,直至OHSMS 18000职业健康安全管理体系的具体要求,无不体现了以人为本和着眼于可持续发展的科学理念。特别是OHSMS 18000的实施,将会有助于推动职业健康安全法规和制度的贯彻执行,使人真正还原于企业和社会的主体地位,而不是异化对象,同时还有利于消除贸易壁垒,并给企业带来直接和间接的经济效益,有助于企业在社会上树立良好的品质和形象。因此,项目在坚持人本管理原则的过程中必须实施思路创新,可通过ISO9000、ISO4000、OHSMS 18000的整合与贯彻实施,使项目管理上升一个全新的层次,走上一个新的台阶。
4.建筑施工項目的发展趋势
4.1推行项目管理责任制
建筑工程项目通常规模比较大、分项工程或单项工程多,施工管理和合同管理难度大。在精干主体的基础上。还必须进一步减化生产关系,减少管理层次,变金字塔式的管理为扁平式管理。实施工程项目管理有多方面的管理要素,不同的工程项目又有不同的管理重点,但项目管理责任制和项目成本核算制始终是项目管理的核心。它的落实与否,决定着项目管理的效果与成败。项目经理在授权范围内处理和协调甲乙方,总包与分包方、监理方、设计方以及当地政府有关部门等各方面的关系,保证工程项目的协调有序实施。企业内部要用完善的市场机制、用人机制、分配机制、服务机制和监督机制等有效机制来保证项目经理责任制的落实。有效灵活的组织体系是实现工程项目的四控制(进度、质量、安全、成本),四管理(合同管理、现场管理、信息管理、生产要素管理),保证工程项目三大目标实现的必要条件。
4.2计算机应用率的提高
提高的管理水平,实现现代化管理,必须应用计算机,计算机是企业管理现代化的重要工具。工程从中标到交工验收,除必须具备较高的施工技术水平外,还应采用先进的现代化施工管理手段来提高企业管理水平,这些管理手段则必须依靠计算机来完成。实践证明,利用计算机辅助管理是提高施工企业管理水平的有效途径。改革开放以来,我国建筑工业围绕着缩短工期、降低造价、提高工程质量和投资效益引入了许多现代化管理方法,如网络计划技术和计算机辅助管理的普遍推行,在一定程度上使各种现代化管理思想和管理手段逐渐融入施工企业的日常管理活动中,对施工企业管理水平的提高、投资效益的改善、工程质量的保证等都起了积极的作用。
总结
建筑工程项目施工管理的创新对建筑施工企业的生存与发展起着越来重要的作用,项目部作为企业的派出机构是企业的分公司,是企业的缩影,代表着企业的形象,体现着企业的实力,是企业在市场的触点,是企业获得经济效益和社会效益的源泉,因此项目施工管理的有效运作是建筑施工企业的生命,惟有创新才能使生命之树常青。
参考文献
[1]江新.建筑工程施工管理的发展方向及创新思路研究[J].科技致富向导,2011
[2]毕淑杰.建筑工程施工管理的现状分析及改进[J].中国房地产业,2011
[3]李强.试论建筑工程施工管理创新[J].才智, 2011
[4](美)J.D.费雷姆.新项目管理[M].北京:世界图书出版社,2001
[5]赵涛,潘欣鹏.项目整体管理[M].北京:中国纺织出版社,2004
注:文章内所有公式及图表请用PDF形式查看。
关键词:建筑工程;项目施工;管理;创新
Abstract: with the development of scientific technology, the size and the complexity of the project continues to increase, engineering construction cycle is long, the project personalized strong. Because of the complexity of the project, it is necessary to implement professional coordination. Project management work still have defects, the author after years of work experience put forward the corresponding countermeasures and specific engineering project management method, in order to improve our country building engineering management level of the enterprise to provide the reference.
Keywords: building engineering; Project construction; Management; innovation
中图分类号:TU71文献标识码:A 文章编号:
建筑工程项目作为企业施工的主战场,不仅是展示企业形象的窗口、造就和培养企业管理人才的摇篮,更是企业经济效益的源泉所在。为了确保安全、优质、按期向顾客提供产品,同时为了实现效益目标,施工企业一般都会及时组建集团指挥部、子公司项目经理部及其所属施工队的分级管理机构。实践证明,这样的管理模式在施工管理、质量监控、安全保证及资金管理等方面取得了明显的成果,但也存在管理人员冗余、机械设备和资源不能有效配置等问题。本文就建筑工程项目施工管理的发展与创新做了探索。
1建筑工程项目施工管理的内容
施工阶段就是对工程实施具体管理阶段,施工阶段也是花费时间最长,因此要面对时间带来的变化要求对工程进行全方位动态的管理。
1.1施工进度的管理
施工进度的控制内容:对以前的施工进度计划进行研究调整以及实施施工计划。
施工进度控制方法主要是规划、控制、协调。
(1)规划是指在施工项目实施的全部过程中进行施工,确定施工项目总进度控制目标和分进度控制目标,并编制其进度计划。
(2)控制是指在施工项目实施的全过程中,进行施工实际进度与施工计划进度的比较,出现偏差及时采取措施调整。
(3)协调是指协调与施工进度有关的单位、部门、和工作队之间的进度关系。
1.2质量管理
在工程开工前根据业主要求、工程的实际情况和企业的规划确定工程项目的质量目标。坚持“百年大计、质量第一”做好事前、事中、事后三环节工作,抓好质量控制。事前质量控制,指在正式施工前进行的质量控制,其控制重点是做好施工前准备工作,且施工准备工作要贯穿于施工全过程中。事中根据对影响工程质量的关键特点,关键部位及重要影响因素设质量管理点的原则,设置专人负责。建立高效灵敏的质量信息反馈系统。专职质检员、技术人员作为信息中心,负责搜集、整理和传递质量动态信息给决策机构。
1.3安全管理
确定安全生产目标:达到五无目标,即“无死亡事故,无重大伤人事故,无重大机械事故,无火灾,无中毒事故”。各专业班组认真钻研设计图纸进行技术交底,认真学习和深刻体会施工技术规范和施工安全规范。经过培训交底达到合格的职工才允许上岗操作,为安全工作顺利圆满开展打下坚实的基础。在施工过程中,建立每周一次的安全教育,由项目经理或专职安全员支持。同时在每道施工工序进行前,由专职安全员做书面的安全技术交底,各班组长带领施工人员认真贯彻落实。
1.4成本的控制
成本控制是指在项目成本的形成过程中,对生产经营所消耗的人力资源、物质资源和费用开支,进行指导、监督、调节和限制,及时纠正将要发生的和已经发生的偏差,把各项生产费用,控制在计划成本的范围之内,以保证成本目标的实现。
2.我国建筑工程施工项目管理存在的一些问题
2.1管理模式不合理
我国建筑企业经济效益不高,其主要原因是管理模式不合理,而目前我国建筑工程的管理模式是由计划经济的管理模式传承下来的,大型国有企业在这一点上体现得尤为明显。具体表现为:以行政手段和硬性指令代替科学的管理方法,建筑企业按固定建制组织生产,违背了工程建设的客观规律,使建筑施工企业无法根据工程项目的具体情况优化配置生产要素,不可避免地造成资产利用率低下。
2.2管理方法的落后
2.2.1工期制定方面
制定进度计划依靠以往积累的经验,“拍脑袋”定工期。编制方法只使用简单的横道图,而不使用先进的网络计划技术。
2.2.2人员素质方面
目前,施工项目的直接作业人员普遍存在素质不高的现象。技术人员流动性非常大,难以进行统一的技术业务培训,技术水平参差不齐,施工质量难以得到保证,因此有些技术方案难以实行,造成每个工程项目之间的质量差别非常大。
此外,一些业主在项目竣工通过验收后没有及时结算工程款。而施工单位不愿为了结算款而依据合同与业主打官司,因为施工单位担心由此得罪业主,破坏在整个施工工程中与业主结下的良好合作关系。但是,结算款往往包含了施工单位的利润,甚至还包括施工单位垫付的成本或以施工单位名义赊购的材料款。业主拖欠支付结算款严重影响了施工单位扩展壮大的时机。
2.2.3 控制方面
在工程项目的实施过程中,控制的理论和方法应用得比较少,尤其是前馈控制和日常控制没有落实到具体的应用上。量化的控制手段更是不多见,采用的控制方法随意性非常大。
2.3 组织形式不科学
2.3.1管理上高度集权
地域性公司和各工程公司没有独立经营权,易导致决策不及时,难以适应市场的变化,同时也难以调动各分公司的积极性。
2.3.2 组织机构的设计不合理
直线职能制组织结构适用于产品固定的生产制造型企业,对于市场变化快、产品具有单件性的建筑业是不适用的。
2.3.3部门设置不科学
一些建筑工程公司没有考虑新产品的开发和新事业的开拓而科学设置部门,工程公司中各部门多数按专业划分,每建设一个项目就要调动所有专业的工程公司,造成资源的浪费。
2.3.4 用工制度不灵活
由于建筑行业具有生产能力的不均衡性,在任务不饱满的情况下,企业也要承担大量固定工的工资,加重企业负担。
2.4 材料供应缺乏系统管理
在材料供应上突出的问题是不急需的材料被大量囤积,而急需的材料往往因为资金的原因不能及时进场。造成这种结果的原因是大多数建筑公司的供应缺乏系统管理,材料计划和仓储计划没有纳入进度计划体系中,材料的进场时间、数量和使用部位落实得不具体。如钢材、水泥等大宗材料,往往采取大批量进货的方式,这样既占用大量资金和场地,还容易造成材料损失和二次倒运。而且,当工程进度和工期变化时,材料供应计划难以得到相应的调整,造成大量暂时不用的材料涌入现场。由于资金被大量占用,一旦后續资金出现困难,工程项目的建设将受到影响。
3.管理方法创新
管理方法创新是项目管理有机处理和协调好工期、质量、成本多项目标的关键,是项目管理成败的重要保证。
3.1进度控制手段创新
作为进度控制来说,任何一个项目都是一个复杂的系统工程。因此,必须编制施工组织设计。只有这样才能确定一个工程项目各个阶段性的控制点,并从阶段性的成功取得最后的成功。
3.2质量管理方法创新
质量是企业的生命,企业要获得市场主要靠质量。质量控制核心是落实质量责任,严格执行ISO 9000质量管理体系标准,坚持做到时间再紧程序不超越,任务再重标准不降低,条件再差要求不放松。同时继续深入开展全面质量管理和群众性QC小组活动,为质量水平的不断提升创造条件。通过质量控制手段和管理方法的创新,实现不断创优和铸造精品工程的目标,赢得顾客满意,从而不断开拓新领域,占领新市场,最终达到市场创新的目的。
3.3成本控制措施创新
项目是成本中心,成本控制是至关重要的。“成本”是企业绩效管理的核心问题,绝大多数管理活动都是围绕成本而展开的。成本管理是全过程、全方位的管理,从投标承揽任务开始到工程竣工验交,每一个环节每一道工序都要事先预测,认真核算和监控。一个工程的成本包括很多方面,有现场成本,通过现场管理降低成本;有机械设备成本,通过缩短机械使用周期来提高效益;有材料成本,通过控制材料的质差、价差、量差来减低消耗;有劳动力成本,有效地使用劳动力,不搞人海战术,提高劳动生产率;有质量成本,通过提高产品质量来减少无效劳动;有文化成本,通过提高凝聚力来调动积极性。还有运输成本、财务管理成本、安全成本等。完善的项目合同管理也是成本控制的一项关键因素。项目部做工程,不是简单地按行政指令完成任务,而是依法履行合同。项目管理第一要重视研究合同条款,在执行合同中,要对所有的变更以函件形式备案,不能有随意性。第二要善于运用合同,尤其是要善于运用合同索赔,保护自己正当的经济权益。
3.4人本管理思路创新
项目管理必须始终坚持以人为本的思路不动摇。无论是ISO9000质量管理体系所倡导的八大质量管理原则,还是ISO 14000环保管理体系,直至OHSMS 18000职业健康安全管理体系的具体要求,无不体现了以人为本和着眼于可持续发展的科学理念。特别是OHSMS 18000的实施,将会有助于推动职业健康安全法规和制度的贯彻执行,使人真正还原于企业和社会的主体地位,而不是异化对象,同时还有利于消除贸易壁垒,并给企业带来直接和间接的经济效益,有助于企业在社会上树立良好的品质和形象。因此,项目在坚持人本管理原则的过程中必须实施思路创新,可通过ISO9000、ISO4000、OHSMS 18000的整合与贯彻实施,使项目管理上升一个全新的层次,走上一个新的台阶。
4.建筑施工項目的发展趋势
4.1推行项目管理责任制
建筑工程项目通常规模比较大、分项工程或单项工程多,施工管理和合同管理难度大。在精干主体的基础上。还必须进一步减化生产关系,减少管理层次,变金字塔式的管理为扁平式管理。实施工程项目管理有多方面的管理要素,不同的工程项目又有不同的管理重点,但项目管理责任制和项目成本核算制始终是项目管理的核心。它的落实与否,决定着项目管理的效果与成败。项目经理在授权范围内处理和协调甲乙方,总包与分包方、监理方、设计方以及当地政府有关部门等各方面的关系,保证工程项目的协调有序实施。企业内部要用完善的市场机制、用人机制、分配机制、服务机制和监督机制等有效机制来保证项目经理责任制的落实。有效灵活的组织体系是实现工程项目的四控制(进度、质量、安全、成本),四管理(合同管理、现场管理、信息管理、生产要素管理),保证工程项目三大目标实现的必要条件。
4.2计算机应用率的提高
提高的管理水平,实现现代化管理,必须应用计算机,计算机是企业管理现代化的重要工具。工程从中标到交工验收,除必须具备较高的施工技术水平外,还应采用先进的现代化施工管理手段来提高企业管理水平,这些管理手段则必须依靠计算机来完成。实践证明,利用计算机辅助管理是提高施工企业管理水平的有效途径。改革开放以来,我国建筑工业围绕着缩短工期、降低造价、提高工程质量和投资效益引入了许多现代化管理方法,如网络计划技术和计算机辅助管理的普遍推行,在一定程度上使各种现代化管理思想和管理手段逐渐融入施工企业的日常管理活动中,对施工企业管理水平的提高、投资效益的改善、工程质量的保证等都起了积极的作用。
总结
建筑工程项目施工管理的创新对建筑施工企业的生存与发展起着越来重要的作用,项目部作为企业的派出机构是企业的分公司,是企业的缩影,代表着企业的形象,体现着企业的实力,是企业在市场的触点,是企业获得经济效益和社会效益的源泉,因此项目施工管理的有效运作是建筑施工企业的生命,惟有创新才能使生命之树常青。
参考文献
[1]江新.建筑工程施工管理的发展方向及创新思路研究[J].科技致富向导,2011
[2]毕淑杰.建筑工程施工管理的现状分析及改进[J].中国房地产业,2011
[3]李强.试论建筑工程施工管理创新[J].才智, 2011
[4](美)J.D.费雷姆.新项目管理[M].北京:世界图书出版社,2001
[5]赵涛,潘欣鹏.项目整体管理[M].北京:中国纺织出版社,2004
注:文章内所有公式及图表请用PDF形式查看。