论文部分内容阅读
系统阐述孟加拉国Dapdap ia桥主桥水中墩施工方案比较,承台、墩身采用吊挂法下放的施工工艺、计算及施工步骤,吊挂法下放的发展前景。
The construction scheme of the pier of Dapdap ia Bridge in Bangladesh is described systematically. The construction technology, calculation and construction steps of the cap and pier body are put down by the hanging method, and the development prospect of the hanging method is decentralized.