论文部分内容阅读
在旧房改造中当原有楼面荷载无法满足新的使用要求时 ,设计采用无粘结预应力扁梁楼盖作为转换层可最大限度地满足大荷载与层高尽可能高的要求。
In the transformation of old houses, when the original floor load can not meet the new requirements, the design of the unbonded prestressed flat beam floor as the conversion layer can meet the maximum requirements of large load and floor height as much as possible.