东西关水电站位于四川省武胜县烈面区境内,是嘉陵江中游河段上一座电航结合、综合开发、以发电为主的待建中型水电工程。该电站1958~1960年间完成了初设阶段的勘测设计,并进行施工准备,1960年调整停建。1984年以来,成勘院受武胜县政府委托、重新进行工作,先后于1987和1988年11月完成了电站的可行性研究和初设报告,于1989年1月经省审查通过。目前,该电站正由地方积极集资筹建中。
Dongshenguan hydropower station is located in the fierce surface area of Wusheng County, Sichuan Province. It is a medium-sized hydropower project to be built on the midstream of Jialing River combining electric power with electric power, comprehensively developed and mainly power generation. During 1958 ~ 1960, the power station completed the survey and design of the initial stage and prepared for construction, and the suspension was adjusted in 1960. Since 1984, Chengbenyuan was entrusted by Wusheng County Government to restart the work. It completed the feasibility study and initial report of the power station in 1987 and 1988 respectively, and was examined and approved by the provincial government in January 1989. At present, the power station is actively funded by the local construction.