如果对可利用土丕进行回收利用,将造成投资多算,如果对不可利用土当成可利用,将会造成投资少算。地勘工作的深度、施工组织设计的合理性、土石方松实系数的换算、定额选择的合理性等直接关系到工程投资的合理性,不同的施工方法、不同的施工顺序、定额选择的不同会得出不同的投资,这就要求预算人员不但要熟悉掌握定额,还要熟悉施工顺序和施工方法,此外还要对设计及地勘等资料有一个全面的了解,据此对每一个单价作出合理的分析,尽量做到不多算、不少算、不重算、不漏算、不错算。
If the available soil Pi for recycling, will result in more investment, if not available as available, will result in less investment. The depth of geological survey work, the rationality of construction organization design, the conversion of earthwork loose coefficient, the rationality of quota selection and so on are directly related to the rationality of project investment, different construction methods, different construction sequence, different choices of quota Draw different investment, which requires budget personnel not only familiar with the fixed quota, but also familiar with the construction sequence and construction methods, in addition to the design and geological prospecting and other information to have a comprehensive understanding, thus making a reasonable price for each Analysis, try not to be counted, a lot of calculations, no recalculation, no loss calculation, a good count.