随着我国国民经济快速而持续的发展,对铁路的运输能力提出了更高的要求。由于铁路大提速和跨越式的发展,对铁路运输生产设备供电的安全可靠性提出了更高的要求,本文结合沪宁城际客运专线常州35/10KV变配电所倒接开通过程,在新老变配电所倒接期间如何对既有运行供电设备影响降到最低程度进行了分析。
With the rapid and sustained development of our national economy, higher requirements are put forward on the railway transport capacity. Due to the speeding up and leaping development of railways, higher requirements are put forward on the safety and reliability of power supply for railway transportation equipment. In this paper, the 35 / 10KV substation of Changzhou inter-city passenger dedicated line is inverted and opened up, How to minimize the impact of the existing power supply equipment during the connection of the old substation.