论文部分内容阅读
现将2006年4月份超偏载检测装置运用和检测情况通报如下:1基本情况1.1上海、兰州、哈尔滨铁路局设备运用状况良好,信息上传率、匹配率等六项指标综合排名居前列。具体考核排名情况见附表1。1.24月份严重超载车为374辆,较3月份减少112辆。各铁路局装车严重超载车数、严重超载率
Now in April 2006 overloading and unloading detection devices and detection of the situation are reported as follows: 1 Basic 1.1 Shanghai, Lanzhou, Harbin Railway Bureau equipment is in good condition, information upload rate, match rate and other six indicators in the forefront. Specific assessment of the rankings see Schedule 1. 1.2 months of serious overloaded vehicles for the 374, 112 fewer than in March. Each railroad bureau is loaded with a serious number of overloaded vehicles, a serious overload rate