建设单位:中国石油股份公司青海油田公司。工程内容:工程西起位于柴达木盆地东部三湖地区涩北1号气田集气总站的涩宁兰管线涩北首站,东至甘肃省兰州市西固区柳泉乡兰州末站,途经青海、甘肃的6个地(市、州)13个县(市、区),全长945.3 km。管线基本与原涩宁兰管线并行或者伴行。沿
Construction Unit: China National Petroleum Corporation Qinghai Oilfield Company. Project Description: The project starts from the Sebei-Ningbei Sebei Beidou Station in the Sebei Gas Field Gathering Station in the Sanhu District of the eastern part of the Qaidam Basin and ends at Lanzhou Terminal Station in Liuquan Township, Xigu District, Lanzhou City, Gansu Province Qinghai, Gansu 6 (cities, prefectures) 13 counties (cities, districts), a total length of 945.3 km. The pipeline is basically parallel with or parallel to the original Ninglan pipeline. along