杭州机械设计研究所设计、富春江水工机械厂的HL115—3 F1500A预冷砼搅拌楼于1988年5月26日在七局铜街子工地安装,一次调试成功,已由水电七局通过验收。该搅拌楼是我国第一台带风冷、冰冷的预冷楼,理论生产率为115m~3/h,低温砼理论生产率为60m~3/h。在设计上全部采用装拆式管柱钢架结构。搅拌楼旁侧附有冷风楼钢结构,放置冷风机设备,搅拌楼中的三种骨料均考虑了通冷风所必需的设施,并设有从冰楼输入片冰的装置,能满足低温砼的要求。
The design of Hangzhou Institute of Mechanical Design and the HL115-3 F1500A pre-cooling and mixing plant of Fuchunjiang Hydraulic Machinery Factory were installed on the site of the 7th Bureau of Tongjie Sub-council on May 26th, 1988. The first commissioning was successful, and it was approved by the 7th Bureau of Hydropower. . This mixing tower is the first pre-cooled building with air-cooled and ice-cooled buildings in China. The theoretical productivity is 115m~3/h, and the theoretical productivity of low-temperature helium is 60m~3/h. In the design, all the steel structures used for disassembly and assembly are adopted. The side of the mixing tower is flanked by the steel structure of the cold wind tower, and the chiller equipment is placed. The three types of aggregate in the mixing tower take into account the facilities necessary for cold wind, and there is a device for inputting ice sheets from the ice house to meet the low temperature requirement. The request.