国家大规模的淤地坝建设,持续的高投入,必将给黄土高原地区水土保持生态建设事业带来巨大的发展机遇,国家对淤地坝建设等各方面的工作也将提出更新更高的要求。结合自身从事碾压式土坝的监理工作实践,提出在监理过程中应控制好淤地坝施工准备、施工、竣工验收三个阶段,着重论述了施工阶段控制的方法和要点,提出淤地坝工程监理中存在的一些具体问题,为今后的工作提供借鉴。
Large-scale siltation dam construction, sustained high investment, will surely give the Loess Plateau area water and soil conservation and ecological construction has brought tremendous opportunities for development, the country’s construction of silt dam and other aspects of the work will be proposed to update a higher Claim. In combination with its own practice of supervision of roller compacted earth dam, it is suggested that the construction preparation, construction and completion acceptance of silt dam should be controlled in the supervision process. The methods and key points of control during construction phase are emphatically discussed. Some specific problems in project supervision provide reference for future work.