论文部分内容阅读
先简要介绍了笔者单位直燃型溴化锂机组及其集中控制系统的配置情况以及为防止其中一台机组冬季制冷冷却水温度过低而采取的设计方案,然后针对机组冬季出现的冷剂水不足的故障,分析原因并利用现有条件排除故障,最后总结本故障排除过程中的相关经验。
First of all, this paper briefly introduced the configuration of the direct-fired lithium bromide unit and its centralized control system and the design plan to prevent the temperature of one of the units from being too cold in winter cooling water. In the light of the cold water shortage in winter , Analyze the cause and use existing conditions to troubleshoot, and finally summarize the relevant experience in this troubleshooting process.