Joint optimization scheduling for water conservancy projects in complex river networks

来源 :Water Science and Engineering | 被引量 : 0次 | 上传用户:djsfhkjthrekl
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks. In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4 It is clear that the j oint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks .
其他文献
Though the ensemble Kalman filter(EnKF) has been successfully applied in many areas, it requires explicit and accurate model and measurement error information,
期刊
目的探讨冰毯亚低温治疗急性脑卒中的临床疗效及对生命体征的影响。方法随机将发病12h内入院的78例急性脑卒中患者分为亚低温治疗组和常规药物治疗组。亚低温治疗组在药物治
2.2.8二元乙丙橡胶(EPM)CH2—CH2 m—CH2—CH nCH3(1)制造与种类①这是一种由乙烯和丙烯在烃类溶剂中通过钒系齐格勒催化剂聚合制成的合成橡胶;②可用过氧化物交联。(2)特征
Considering the fact that the original two-parameter LCM model can only be used to investigate rainfall losses during the runoff period because the initial abst
礼成绽放惊艳全球一场秋雨的洗礼之后,金地·湖城大境项目展示区于10月31日礼成绽放,引起了全国范围各界媒体及客户的高度关注,云集西安共庆盛会。 After the baptism of th
目的探讨脑胶质瘤术后应用间质性内化疗的临床疗效。方法脑胶质瘤术后放置Om-maya化疗囊,术后1周开始间质化疗,每周1次,连续6周。结果化疗结束4周后行疗效评定CR(完全缓解)23