在国民经济调整时期,水电建设在调整改革中,个别电站停缓建,机电设备亟待处理,大批在建电站土建工程尚未完工而机电设备已到货,对这些未安装设备如何管理、储存、维修,保证安装时质量完好,减少损失,提高经济效益,是管理上、技术上的重大课题。本刊选登吴椋同志这篇文章,就是从科学管理这个目的,探讨提高未安装电站设备经济效益的途径。 In the period of national economic restructuring, hydropower construction in the adjustment and reform, construction of individual power stations stop construction, mechanical and electrical equipment urgently need to be addressed, a large number of civil works in power plant construction is not yet completed and mechanical and electrical equipment has arrived, these uninstalled equipment how to manage, store, repair It is a major issue in management and technology to ensure the quality of installation is good, the loss is reduced and the economic benefits are improved. This article selected Comrade Wu star this article, is from the scientific management of this purpose, to explore ways to improve the economic efficiency of the installation of power plants without means.
其他文献
为了给葛洲坝二、三江工程的国家竣工验收作好准备,水电部葛洲坝竣工初验组于1983年12月22日至1984年1月6日在葛洲坝工地对二、三江工程进行了竣工初验。这次初验是在大江截
为进一步加快我国水利水电建设,我认为在当前水利水电建设中,除须借鉴国外比较先进的技术外,还要认真总结我国在水利水电建设的规划、勘测、设计、施工和运行等方面的创新经
近日,教育部办公厅、农业部办公厅下发了《中等职业学校新型职业农民培养方案试行》(以下简称《方案》)的通知,要求各地根据实际情况制定具体政策,组织实施。《方案》规定:新
促性腺激素释放激素激动剂 (Gn RHα)能短时缩小子宫肌瘤体积 ,术前每月应用一次 Gn RHα,共 2或 3次 ,可明显缩小子宫肌瘤体积 ,减少术中出血量并缩短手术时间。然而应用Gn
水电站的施工期一般分为施工准备期,即从开始修建对外交通和附属企业到主体工程开工的时段,施工高峰期,即从主体工程开工到第一台机组发电的时段; 施工结尾期,即从第一台机
葛洲坝水利枢纽一期工程的基础岩石主要有砂岩、粉砂岩、粘土质粉砂岩、粘土岩及砾岩等。其分布情况为,三江以砂岩为主,二江电厂和安装场以砂岩、粉砂岩互层为主,二江泄水闸
印度1970~1982年期间水电发展情况如下表所列。 The development of hydropower in India from 1970 to 1982 is listed in the following table.
前言近年来不少科学家对卡门过滤理论颇感兴趣,并已将它应用于许多科学领域内。美国水文学家也对卡门过滤理论十分感兴趣,并把它用于河川流量预报上,收到了良好的成效。本文
他认为自己是同世代中最伟大的导演,是其中唯一真正有实力的人,奥斯卡奖项应该以他命名——他还谈到是否真的会在第十部电影后息影。“作为一个艺术家生活,创造自己的世界及
由水利水电科学研究院仪器工厂研制的ZT-76A型钻孔弹模仪(其中胶囊是与天津橡胶工业研究所共同研制),是对钻孔深部用静力法测量岩体变形特性的仪器。它能测岩体深部预先选定