针对某110 k V全户内智能变电站原设计采用钢筋混凝土管桩基础时存在的问题,经现场分析,拟采用复合桩基方案,指出该加固措施实施效果良好,实测测量值远小于规范限值。采用的地基处理方案针对性较强,工程事故处理方案实用性、经济性均较好。
Aiming at the existing problems in the original design of a 110 kV indoor intelligent substation using reinforced concrete pipe pile foundation, the complex pile foundation plan is proposed to be adopted in the field analysis, indicating that the reinforcement measures are effective and the measured values are far less than the specification limits . The ground-based treatment plan used is highly targeted, and the engineering accident treatment scheme is practical and economical.