论文部分内容阅读
公寓前那条不足100米的路已经修了3个月,但似乎仍望不到完工之日。3个月前,两辆巨大的城市下水管修理车驶入原本就不宽敞的街道,占据了五六个停车位,然后两三位技师就对那条路进行分段式的开膛剖腹。德国修路与中国不一样,中国是全面开花,连夜作战,快速完成,然后再赶去修其他的
The road in front of the apartment, less than 100 meters, has been repaired for three months, but it seems that we still can not see the completion date. Three months ago, two huge city sewer repair vehicles drove into otherwise unobstructed streets, occupying five or six parking spaces. Two or three technicians then carried out a sectional open caesarean section on the road. Germany is not the same as China’s road construction, China is fully flowering, fought overnight, quickly completed, and then rush to repair other