摘要:钢筋混凝土一般作为建筑物中主要受力结构,其质量的高低对建筑的使用功用和使用寿命来说有根本的影响。在雨季,由于降水和潮湿为钢筋混凝土施工带来了质量和安全上的隐患,建筑业的工作者和管理者必须加强对钢筋混凝土在雨季的施工。本文从钢筋混凝土在雨季的实际施工经验入手,在描述雨季特点的基础上,提出了钢筋混凝土在雨季施工的要点,希望可以对建筑企业做好雨季钢筋混凝土施工起到参考的借鉴的作用。
关键词:混凝土;雨季;施工;要点;注意事项
Abstract: the reinforced concrete buildings in general as the main stress structure, the level of the quality of construction of the use function and service life, there are fundamental influence. In the rainy season, the precipitation and wet because for reinforced concrete construction brought the quality and safety of the hidden trouble, construction workers and managers must strengthen the construction of reinforced concrete in the rainy season. This paper, from the reinforced concrete in the rainy season of the actual construction experience of the description based on the characteristics of the rainy season, and put forward the concrete construction in the rainy season, the main points of hope for building enterprises can make the rainy season reinforced concrete construction play a reference reference role.
Keywords: concrete; The rainy season; The construction; Points; note
中图分类号:TU528文献标识码:A 文章编号:
前言
钢筋混凝土是现代大型建筑物和重要建筑部位关键的建筑构件,是建筑物中主要的受力结构,被称为:建筑的骨骼。钢筋混凝土质量的好坏对建筑物整体的功用和使用寿命来说有根本的影响。建筑工程一般施工时间跨度比较大,经常出现在雨季施工,由于雨季降水和潮湿的影响,钢筋混凝土的施工质量和施工安全存在着隐患,因此有必要加强对钢筋混凝土雨季施工的管理。应该在分析雨季特点的基础上,结合钢筋混凝土施工的要点,形成适合雨季钢筋混凝土施工的方法,做好钢筋混凝土在雨季的施工工作。
1钢筋混凝土雨季施工的注意要点
钢筋混凝土在雨季进行施工应该注意如下几点:其一,钢筋混凝土质量的控制工作,在雨季由于高温、降水和潮湿等自然条件交替或叠加出现,会引起混凝土原料性质的改变,应加强钢筋混凝土雨季施工质量的控制工作。其二,钢筋混凝土施工的安全管理工作,在雨季由于土壤中含水量高塌方、塌脚的现象经常出现,不但对建筑施工造成影响,严重的还会造成人身伤害事件,因此,应该加强钢筋混凝土雨季施工的安全管理工作。
2钢筋混凝土雨季施工准备工作的要点
做好钢筋混凝土雨季施工应该从建筑工程的设计阶段就做好准备,针对本地雨季的特点设计好钢筋混凝土雨季的施工工作,预设行之有效的应急预案,建立适应钢筋混凝土雨季施工的管理体系
2.1做好准备阶段钢筋混凝土雨季施工的设计工作
在建筑工程的设计阶段就应该对雨季钢筋混凝土施工有所规划,由于钢筋混凝土施工在时间上一般跨度比較大,常常出现雨季施工的情况,因此,做好钢筋混凝土雨季施工的规划和设计就显得尤为重要,是做好钢筋混凝土雨季计划上的基础。
2.2做好钢筋混凝土雨季施工的应急预案
在钢筋混凝土雨季施工中会出现各种意外情况,会影响到工程施工的质量和速度,因此,在工程设计阶段应该针对雨季的特点进行有预见性的准备,将可能出现的紧急情况和意外事故控制在初始状态,减少对工程施工的影响,降低危害的损失。
2.3健全钢筋混凝土雨季施工的管理体系
在钢筋混凝土施工中应该建立专门针对季节和恶劣天气的管理制度,和设置雨季施工的管理职位,在管理制度上和管理人员上高度重视钢筋混凝土雨季施工工作,在管理体系上保证钢筋混凝土在雨季的按时保质的完成施工任务。
3钢筋混凝土雨季施工阶段的要点
2.1做好施工地段的排水工作
首先,做好施工工地的排水工作,挖掘排水沟渠,敷设排水管道,及时将雨水、渗水和反水排出施工地段。其次,做好基坑的防护工作,对于开挖的基坑应根据地质情况做好基坑边坡防护工作,以防雨水冲刷造成塌方、滑坡。最后,做好地下基础的回填工作,对于施工完的地下基础应及时进行回填,防止雨水和流水的侵蚀
2.2做好钢筋混凝土原料的防水工作
首先,做好原材料防雨工作,经常检查水泥、钢筋等堆放物雨棚的防水性及场地的排水。其次,做好原材料的防潮工作,经常检查石灰、钢铁构筑物的防潮工作,避免原材料因受潮发生变质。最后,对于容易水溶的原料应该做到专门场地堆放。
2.3做好电气设备的安全工作
首先,做好用电安全知识的普及,使施工人员在认识上高度重视用电安全问题。其次,经常对电气设备进行检查,防止漏电,并保证生活设施不受雨水影响。最后,混凝土搅拌机处搭设防雨棚,防止混凝土搅拌机因雨季漏洞而影响工作
2.4保证钢筋混凝土雨季施工的连续性
首先,预备充足的工程材料和生活物资,在物资角度上保证钢筋混凝土在雨季施工的连续。其次,采用多台班混凝土搅拌机共同工作,保证混凝土拌和不间断。最后,在混凝土运输时,应该采用混凝土输送泵运输和混凝土车载运输相结合的方式,既防止混凝土离析,又防止混凝土受到雨水侵袭,还可以防止钢筋混凝土裂缝的产生。
2.5做好钢筋混凝土雨季施工的辅助工作
首先,在重要钢筋结构物浇筑混凝土前,应配置一些塑料布和五彩布等防雨材料,避免雨水侵入。其次,避免在雨天进行水稳砂砾和沥青混凝土面层施工。其三,避免在最后在雨季进行水稳砂砾和沥青混凝土面层施工要准备防雨苫布,防止因下雨而造成水稳砂砾含水量变化和沥青混凝土降温。其四,因雨量过大引起钢筋混凝土施工停止时,应做好接缝处和施工缝的表面处理,方便进行后续的施工。最后,钢筋混凝土雨季施工应做好天气预报工作,在预报方面减少天气带来的损失。
3总结
钢筋混凝土雨季施工,应该根据现场具体情况确定可进行雨季施工地段,按照有关雨季设计和规范的要求进行钢筋施工,并编制雨季施工措施。如果出现因特殊情况导致钢筋混凝土施工发生改变时,应该及时做好登记和现场资料留存,形成文件,报监理工程师审批,最后记录在案以便日后检查。
后记
综上所述,钢筋混凝土施工是工程建筑的重要组成部分,钢筋混凝土在雨季施工存在着质量和安全上的隐患,是建筑工程中应该引起高度重视的问题,因此本文在基层工作的基础上提出了一些办法和措施,建立钢筋混凝土雨季施工的预案,做好排水和防水的准备工作,加强施工中电气设备的管理和对原材料防潮去湿处理,从思想上重视,在工作中落实,做好钢筋混凝土在雨季中的施工工作。
参考文献:
[1] 王凤清,刘卫庆.浅析多雨季节混凝土施工的质量控制[J]. 四川建材. 2011,04.
[2] 刘文,单连梅,刘兴军.略谈雨季施工混凝土质量控制措施[J]. 科技信息. 2009,19.
[3] 郭殿波,夏鹏.浅谈施工现场的雨季施工防范事项[J]. 黑龙江科技信息. 2011,10.
[4] 马书识,吴小芳.建筑工程雨季施工技术措施[J]. 西部探矿工程. 2005,02.
[5] 杜龙江.住宅类建筑雨季施工的相关技术问题探讨[J]. 中国房地产业. 2011,03.
关键词:混凝土;雨季;施工;要点;注意事项
Abstract: the reinforced concrete buildings in general as the main stress structure, the level of the quality of construction of the use function and service life, there are fundamental influence. In the rainy season, the precipitation and wet because for reinforced concrete construction brought the quality and safety of the hidden trouble, construction workers and managers must strengthen the construction of reinforced concrete in the rainy season. This paper, from the reinforced concrete in the rainy season of the actual construction experience of the description based on the characteristics of the rainy season, and put forward the concrete construction in the rainy season, the main points of hope for building enterprises can make the rainy season reinforced concrete construction play a reference reference role.
Keywords: concrete; The rainy season; The construction; Points; note
中图分类号:TU528文献标识码:A 文章编号:
前言
钢筋混凝土是现代大型建筑物和重要建筑部位关键的建筑构件,是建筑物中主要的受力结构,被称为:建筑的骨骼。钢筋混凝土质量的好坏对建筑物整体的功用和使用寿命来说有根本的影响。建筑工程一般施工时间跨度比较大,经常出现在雨季施工,由于雨季降水和潮湿的影响,钢筋混凝土的施工质量和施工安全存在着隐患,因此有必要加强对钢筋混凝土雨季施工的管理。应该在分析雨季特点的基础上,结合钢筋混凝土施工的要点,形成适合雨季钢筋混凝土施工的方法,做好钢筋混凝土在雨季的施工工作。
1钢筋混凝土雨季施工的注意要点
钢筋混凝土在雨季进行施工应该注意如下几点:其一,钢筋混凝土质量的控制工作,在雨季由于高温、降水和潮湿等自然条件交替或叠加出现,会引起混凝土原料性质的改变,应加强钢筋混凝土雨季施工质量的控制工作。其二,钢筋混凝土施工的安全管理工作,在雨季由于土壤中含水量高塌方、塌脚的现象经常出现,不但对建筑施工造成影响,严重的还会造成人身伤害事件,因此,应该加强钢筋混凝土雨季施工的安全管理工作。
2钢筋混凝土雨季施工准备工作的要点
做好钢筋混凝土雨季施工应该从建筑工程的设计阶段就做好准备,针对本地雨季的特点设计好钢筋混凝土雨季的施工工作,预设行之有效的应急预案,建立适应钢筋混凝土雨季施工的管理体系
2.1做好准备阶段钢筋混凝土雨季施工的设计工作
在建筑工程的设计阶段就应该对雨季钢筋混凝土施工有所规划,由于钢筋混凝土施工在时间上一般跨度比較大,常常出现雨季施工的情况,因此,做好钢筋混凝土雨季施工的规划和设计就显得尤为重要,是做好钢筋混凝土雨季计划上的基础。
2.2做好钢筋混凝土雨季施工的应急预案
在钢筋混凝土雨季施工中会出现各种意外情况,会影响到工程施工的质量和速度,因此,在工程设计阶段应该针对雨季的特点进行有预见性的准备,将可能出现的紧急情况和意外事故控制在初始状态,减少对工程施工的影响,降低危害的损失。
2.3健全钢筋混凝土雨季施工的管理体系
在钢筋混凝土施工中应该建立专门针对季节和恶劣天气的管理制度,和设置雨季施工的管理职位,在管理制度上和管理人员上高度重视钢筋混凝土雨季施工工作,在管理体系上保证钢筋混凝土在雨季的按时保质的完成施工任务。
3钢筋混凝土雨季施工阶段的要点
2.1做好施工地段的排水工作
首先,做好施工工地的排水工作,挖掘排水沟渠,敷设排水管道,及时将雨水、渗水和反水排出施工地段。其次,做好基坑的防护工作,对于开挖的基坑应根据地质情况做好基坑边坡防护工作,以防雨水冲刷造成塌方、滑坡。最后,做好地下基础的回填工作,对于施工完的地下基础应及时进行回填,防止雨水和流水的侵蚀
2.2做好钢筋混凝土原料的防水工作
首先,做好原材料防雨工作,经常检查水泥、钢筋等堆放物雨棚的防水性及场地的排水。其次,做好原材料的防潮工作,经常检查石灰、钢铁构筑物的防潮工作,避免原材料因受潮发生变质。最后,对于容易水溶的原料应该做到专门场地堆放。
2.3做好电气设备的安全工作
首先,做好用电安全知识的普及,使施工人员在认识上高度重视用电安全问题。其次,经常对电气设备进行检查,防止漏电,并保证生活设施不受雨水影响。最后,混凝土搅拌机处搭设防雨棚,防止混凝土搅拌机因雨季漏洞而影响工作
2.4保证钢筋混凝土雨季施工的连续性
首先,预备充足的工程材料和生活物资,在物资角度上保证钢筋混凝土在雨季施工的连续。其次,采用多台班混凝土搅拌机共同工作,保证混凝土拌和不间断。最后,在混凝土运输时,应该采用混凝土输送泵运输和混凝土车载运输相结合的方式,既防止混凝土离析,又防止混凝土受到雨水侵袭,还可以防止钢筋混凝土裂缝的产生。
2.5做好钢筋混凝土雨季施工的辅助工作
首先,在重要钢筋结构物浇筑混凝土前,应配置一些塑料布和五彩布等防雨材料,避免雨水侵入。其次,避免在雨天进行水稳砂砾和沥青混凝土面层施工。其三,避免在最后在雨季进行水稳砂砾和沥青混凝土面层施工要准备防雨苫布,防止因下雨而造成水稳砂砾含水量变化和沥青混凝土降温。其四,因雨量过大引起钢筋混凝土施工停止时,应做好接缝处和施工缝的表面处理,方便进行后续的施工。最后,钢筋混凝土雨季施工应做好天气预报工作,在预报方面减少天气带来的损失。
3总结
钢筋混凝土雨季施工,应该根据现场具体情况确定可进行雨季施工地段,按照有关雨季设计和规范的要求进行钢筋施工,并编制雨季施工措施。如果出现因特殊情况导致钢筋混凝土施工发生改变时,应该及时做好登记和现场资料留存,形成文件,报监理工程师审批,最后记录在案以便日后检查。
后记
综上所述,钢筋混凝土施工是工程建筑的重要组成部分,钢筋混凝土在雨季施工存在着质量和安全上的隐患,是建筑工程中应该引起高度重视的问题,因此本文在基层工作的基础上提出了一些办法和措施,建立钢筋混凝土雨季施工的预案,做好排水和防水的准备工作,加强施工中电气设备的管理和对原材料防潮去湿处理,从思想上重视,在工作中落实,做好钢筋混凝土在雨季中的施工工作。
参考文献:
[1] 王凤清,刘卫庆.浅析多雨季节混凝土施工的质量控制[J]. 四川建材. 2011,04.
[2] 刘文,单连梅,刘兴军.略谈雨季施工混凝土质量控制措施[J]. 科技信息. 2009,19.
[3] 郭殿波,夏鹏.浅谈施工现场的雨季施工防范事项[J]. 黑龙江科技信息. 2011,10.
[4] 马书识,吴小芳.建筑工程雨季施工技术措施[J]. 西部探矿工程. 2005,02.
[5] 杜龙江.住宅类建筑雨季施工的相关技术问题探讨[J]. 中国房地产业. 2011,03.