去年我省集中暴雨较多,江河水位猛涨,农田水利工程水毁严重,遭受破坏的拦河坝达250多座,多是柳石坝和半永久性溢流堆石坝。拦河坝被水毁情况有的是坝被彻底冲毁需重建的;有的是坝在主流被冲开口子;也有的是坝面被扒去一层块石;还有的是在坝端与岸边接触处被冲开,河流改道。造成毁坝的主要原因:一是今年有些中小河流出现洪水或特大洪水,流急、量大,超过了拦河坝本身的承受能力。二是我省拦 Last year, there were more rainstorms concentrated in our province, soaring water levels in rivers and waterways, severe water damage in farmland water conservancy projects, and over 250 blocks of barges damaged. Most of them are the Liushi Dam and semi-permanent overflow rockfill dam. Some of the dam was destroyed by water dam reconstruction is necessary to complete; some dam is being opened in the mainstream; some dam was paved to a layer of stone; others are in contact with the shore and the dam was washed away, the river Diversion. The main reason for the destruction of dams: First, some small and medium-sized rivers this year, flooding or catastrophic floods, emergencies, large quantities, more than the barrage itself can afford. Second, our province stopped
其他文献
本文从地质构造、岩性特征、地下水赋存条件和分布规律等方面,较详细的论述了下生本营子——车坊断裂地下水赋存特征,同时指出压性断裂影响岩带是地下水富集的最有利部位。
档案管理工作是学校对学生基本信息进行了解的一类重要途径,能够作为学校对学生进行管理的有效依据。在本文中,将就中职学校档案管理存在的问题及对策进行一定的研究与分析。
由水电部珠江水利委员会、浙江省围垦开发中心、辽宁省水利综合开发经营公司有关负责同志一行5人组成的考察团,于1986年5月22日至6月4日,赴朝鲜民主主义人民共和国对西海岸
一、流域概况九龙江西溪发源于博平山脉的佛耳山之间,流域面积约为4000平方公里,河流主干道全长171公里,流域形状呈扇形,上游分:花山溪流经平和在南靖与船场溪会合,向东流至
由南京水科院进行的淮河正阳关至茨淮新河口大型防洪河工模型试验研究,历时3年,于1988年9月17日通过鉴定。试验河段长120多公里,摆幅25公里,模型水平及垂直比尺均为1/100,变
由于受到世界饲料价格上升的影响,东南亚各国今年将增加饲料进口,以适应发展畜牧业所需。 据称,今年度东南亚国家进口玉米将增加10%~15%,其中以印尼进口最多,还有马来西亚及泰
以双湖地堑为代表,羌塘地体内最新构造表现为东西向伸展作用下产生的南北向地堑构造,双湖地堑由一系列近于平行的北东至北北东向正断层组成,断层几何学、运动学及断陷盆地内
一、概述岩滩水电站为目前广西在建的最大水电站,装机容量121万瓩,施工导流采用左岸开挖大明渠右边设导流墙,穿经主体工程部份从#19~23坝段做成八个4×10米底孔,顶板高程163米
近年来,日本的坝工建设由于水利资源的有效利用和经济的发展,综合利用工程比单一目的工程建造数量要多。在坝型分类统计上看,以填筑坝(包括土坝和堆石坝)为主,占60%,重力坝
正在施工中的四川铜街子水电站,拦河坝坝基靠左岸处有一深槽,槽口宽约40米,最深达70米,主要充填砂卵石,但中部夹有20米厚的粉细沙。由于挖除困难,采用覆盖层上建堆石坝,坝基