水电作为电力的一个组成部分,在苏联第十一个五年计划中,其作用得到很大提高.根据苏共第26次代表大会的决议,在苏联动力发展纲要的基础上,电力生产结构正在进一步改进,因此,要求水电站在机动灵活的运转条件下具有高度的可靠性.由于电力系统增加了对尖峰出力的需求,要求充分利用水电站的装机容量,节约水资源.该项任
As an integral part of electricity, hydropower has been greatly enhanced in its role in the 11th Five-Year Plan of the Soviet Union.According to the resolution of the 26th Congress of the CPSU, on the basis of the Soviet Union’s power development program, the power production structure is being implemented Therefore, hydropower stations are required to have a high degree of reliability under the conditions of flexible maneuvering.As the power system increases the demand for peak output, it is required to fully utilize the hydropower station’s installed capacity and save water resources.