随着经济发展,城市地铁建设规模不断扩大;目前地铁五号线土建工程基本完成;通过对北京地铁五号线蒲黄榆车站实施性施工组织分析,在施工、管理及结构设计等方面进行评价,以期为后续城区暗挖地铁施工吸取经验和教训。
With the economic development, the scale of urban subway construction continues to expand. At present, the civil engineering of Subway Line 5 is basically completed. The construction construction of Puhuangyu Station on Beijing’s Fifth Line of Subway is analyzed and the construction, management and structural design are evaluated. Subsequent urban subway construction excavation lessons and lessons learned.