论文部分内容阅读
在混凝土冬季施工中,由于气温较低,不仅给施工带来很大困难,而且由于强度增长缓慢,常常与加快工程进度的要求发生矛盾。因此,人们对努力寻求更为方便的施工方法,既能保证工程质量,又能加快工程进度寄予很大关注。多年的施工经验表明,在冬季施工中,工程质量的优劣常常和选择的施工方法,制定的技术措施,以及涉及的施工费用有密切关系。本文拟通过对几种施工方法的分析,提出建议方案,供施工中参用。
In the winter construction of concrete, due to the low temperature, it not only brings great difficulties for construction, but also due to the slow growth of strength, it often contradicts with the requirement of accelerating the progress of the project. Therefore, people are paying great attention to efforts to find more convenient construction methods that can both ensure the quality of the project and accelerate the progress of the project. Many years of construction experience show that in the winter construction, the quality of the project often has a close relationship with the selected construction method, the technical measures formulated, and the construction costs involved. This article intends to analyze the several construction methods and propose proposals for use during construction.