论文部分内容阅读
2012年11月18~20日,水利水电规划设计总院在北京主持召开会议,对《水利水电工程调压室设计规范》(送审稿)进行了审查。参加会议的有长江勘测规划设计有限责任公司、黄河勘测规划设计有限公司、上海勘测设计研究院、甘肃省水利水电勘测设计研究院、湖北省水利水电规划勘测设计院、河北省水利水电勘测设计研究院、河南省水利勘测设计研究有限责任公司、山东省水利勘测设计院中水东北勘测设计研究有限责任公司、中国水电顾问集团华东勘测设计研究院、辽宁省水利水电勘测设计研究院的专家和代表。
From November 18 to November 20, 2012, the General Planning and Design Institute of Water Conservancy and Hydropower hosted a meeting in Beijing to examine the “Code for Design of Surge Chamber of Water Conservancy and Hydropower Projects” (submitted for review). Participants at the meeting include the Yangtze River Survey and Planning Design Co., Ltd., the Yellow River Survey and Design Co., Ltd., Shanghai Survey and Design Institute, Gansu Provincial Institute of Water Resources and Hydropower Survey and Design, Hubei Provincial Water Conservancy and Hydropower Planning Survey and Design Institute, Hebei Province, Institute, Henan Province Water Conservancy Survey and Design Research Co., Ltd., Shandong Province Water Conservancy Survey and Design Institute of China Water Northeast Survey and Design Research Co., Ltd., China Hydropower Consultants Group East China Survey and Design Institute, Liaoning Province Water Conservancy and Hydropower Survey and Design Institute of experts and representatives .