1982年,全世界14个国家地热发电厂的装机容量增加了10%,达到2857兆瓦。美国的发电量为1049兆瓦,增加了13%。最近新建的发电厂有:加里福尼亚北部盖塞尔地热区110兆瓦的17号机组;菲律宾蒂威的110兆瓦机组;日本北海道岛莫里的50兆瓦发电厂;墨西哥新火山带洛斯阿朱弗雷斯的5台井口发电机组成的25兆瓦发电厂;以及加里福尼亚因佩尔谷索尔顿湖南岸的加里福尼亚南部爱迪生10兆瓦闪蒸发电厂。 1982年1月,联邦地产的地热租借管理权已从美
In 1982, the installed capacity of geothermal power plants in 14 countries worldwide increased by 10% to 2857 MW. The United States generated 1049 megawatts, an increase of 13%. Newly-built power plants are: 110 MW of Unit 17 in Geiser Geothermal Area in northern California; 110 MW of unit in Tiwi, Philippines; 50 MW in Mori, Hokkaido, Japan; a new volcano in Mexico A 25-megawatt power plant made up of five wellhead generators in Los Arjoufres, and a 10-megawatt Edison 10-megawatt flash-power plant in Southern California in the southern bank of the Altona Lake in the Indianapolis, Indianapolis. January 1982, Federal Territory geothermal lease management has been from the United States