白石窑水电厂位于广东北江干流,以发电为主,兼有防洪、航运、养殖及改善生态环境等综合效益的水利枢纽工程。水电厂建筑物主要由左、右岸土坝、船闸、22孔泄水闸、发电厂房、变电站、办公大楼组成。水电厂装有4台灯泡贯流式水轮发电机组,设计水头为7.8m,单机出力18MW,总装机容量为72MW,多年平均发电量为2.915亿kW·h。1999年2月24日4号机组并网发电投入商业运行,全厂4台装机全面投产。电厂几年来发电连获丰收,见表1。2002年1月1日至12月10日累计发电达2.94亿kW·h,根据目前北江流量,2002
Baishiyao Hydropower Plant is located in the main stream of Beijiang River in Guangdong Province and mainly produces electricity. It is also a water conservancy project that integrates flood control, shipping, aquaculture and ecological improvement. Hydropower plant buildings mainly from the left and right bank earth dam, ship lock, 22 holes sluice, power plants, substations, office buildings. The hydropower plant is equipped with 4 bulb tubular turbine units with a design head of 7.8m and a stand-alone output of 18MW with a total installed capacity of 72MW and an average annual generation of 2.915 billion kW · h. On February 24, 1999, No. 4 unit grid-connected power generation was put into commercial operation and the whole plant was put into operation in full scale. In recent years, the power plant has received a bumper harvest, as shown in Table 1. From January 1 to December 10, 2002, cumulative power generation reached 294 million kW · h. According to the current North River flow, 2002