基于有限差分软件,对湖南沅水特大桥主梁0#、1#块施工托架进行了空间受力分析,获得了其应力分布特点,指出其薄弱环节。并结合施工监测结果,对托架结构的安全与稳定性进行了评价。研究结果表明:托架系统的牛腿根部、贝雷梁、腹板和横隔板处的脚手架受力最为不利,同时由于施工方法的局限性,施工过程中易出现应力不均匀、局部应力和变形过大等问题,因此托架安装过程中,应尽量保证托架各组成部分的平整度,消除施工过程中的不均匀受力;0#、1#段截面高度较大时,混凝土应分期浇筑,以减小托架系统承受的后浇注混凝土质量和托架的弹性变形、模板系的非弹性变形;同时在保证托架系统承载力的情况下,应尽量减少1期和2期混凝土浇筑的时间间隔,以减少混凝土的收缩徐变差,确保结构质量。
Based on the software of finite difference, the space force analysis of the construction brackets of 0 # and 1 # blocks in the main girder of Yuanshui Grand Bridge in Hunan Province was carried out. The stress distribution characteristics were obtained and the weak links were pointed out. Combined with the construction monitoring results, the safety and stability of the bracket structure were evaluated. The results show that the scaffolding at the base of the corbel, the Berenella, the web and the crossbar of the bracket system is the most unfavorable. At the same time, due to the limitation of the construction method, the stress is not uniform in the construction process, and the local stress Deformation is too large and so on, so the bracket installation process, should try to ensure the flatness of the various components of the bracket, to eliminate uneven force in the construction process; 0 #, 1 # section height, the concrete should be staged Pouring, to reduce the carriage system to withstand the quality of post-poured concrete and bracket elastic deformation, the inelastic deformation of the template; the same time, to ensure the bearing capacity of the system, should minimize 1 and 2 concrete pouring Of the time interval to reduce the shrinkage of concrete creep, to ensure the quality of the structure.