Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island c

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:dexiaolu
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In allusion to the problems of complex stress distribution in the surrounding rock and deformation failure laws, as well as the difficulty in roadway supporting of the gob-side entry driving in the island coal face, 2107 face in Chengjiao Colliery is researched as an engineering case. Through physical mechanical test of rock, theoretical and numerical simulation analyses of rock, the analysis model of the roadway overlying strata structure was established, and its parameters quantified. To reveal the deformation law of the surrounding rock, the stability of the overlying strata structure was studied before, during and after the roadway driving. According to the field conditions, the stress distribution in coal pillar was quantified, and the surrounding rock deformation feature studied with different widths of the pillars in gob-side entry driving. Finally, the pillar width of 4 m was considered as the most reasonable. The research results show that there is great difference in support conditions among roadway roof, entity coal side and narrow pillar side. Besides, the asymmetric control technique for support of the surrounding rock was proposed. The asymmetric control technique was proved to be reasonable by field monitoring, support by bolt-net, steel ladder and steel wire truss used in narrow pillar side. In allusion to the problems of complex stress distribution in the surrounding rock and deformation failure laws, as well as the difficulty in roadway supporting supporting the gob-side entry driving in the island coal face, 2107 face in Chengjiao Colliery is researched as an engineering case Through physical mechanical test of rock, theoretical and numerical simulation analyzes of rock, the analysis model of the roadway overlying strata structure was established, and its parameters quantified. To reveal the deformation law of the surrounding rock, the stability of the overlying strata structure was asked before, during and after the roadway driving. the stress distribution in rug pillar was quantified, and the surrounding rock deformation feature studied with different widths of the pillars in gob-side entry driving. width of 4 m was considered as the most reasonable. The research results show that there is great difference in support其它, the asymmetric control technique for support of the surrounding rock was proposed. The asymmetric control technique was proved to be reasonable by field monitoring, support by bolt-net, steel ladder and steel wire truss used in narrow pillar side.
其他文献
期刊
随着国家化学工业的飞速发展,一般的化工企业对于员工的从业知识和技能,以及对于相关的职业教育和培训都提出了更高的要求.同时,化工机械基础是非机械类专业的核心教程,对于
[本刊讯]7月17日,晶宫装饰新老毕业生交流座谈会在公司多功能厅举行,此次座谈会由人力资源部李总监主持。  会议伊始,李总监代表公司对刚刚加入晶宫装饰的新力军表示了热烈的
目的 观察急性白血病化疗联合应用参芪扶正注射液对患者外周血和骨髓的影响.方法 将64例患者随机分为两组,治疗组34例,在化疗的同时静脉滴注参芪扶正注射液;对照组30例,单纯采用化疗.结果 化疗后第15天,治疗组白细胞(wBC)、血红蛋白(Hgb)、血小板(Plt)显著升高,31例骨髓增生活跃,3例增生低下,对照组仅8例增生活跃,22例增生低下,两组有显著性差异(P<0.05).结论 化疗联合参芪扶
5月10日17时,甘肃岷县发生特大冰雹山洪泥石流灾害,由于降水时段集中,降雨量大,全县18个乡镇均遭受冰雹山洪泥石流灾害袭击,给人民群众的生命财产造成了巨大损失。
目的 探讨内镜下十二指肠乳头括约肌切开(endoscopic sphincterotomy,EST)胆道取石联合腹腔镜胆囊切除术(laparoscopic cholecystectomy,LC)治疗胆囊结石合并肝外胆管结石的临床应用价值.方法 回顾性分析2003年9月至2007年11月我院应用EST与LC联合治疗32例胆囊结石合并肝外胆管结石的临床资料.结果 十二指肠镜下行逆行胰胆管造影(endo
为了对富含水、淋水状态下破碎煤岩体进行有效的堵水加固,本文研制出新型聚氨酯堵水材料,在破碎煤岩体大范围淋水条件下.可以正常反应,凝胶时间1-10 min(可调),一次封堵裂隙
目的 研究抗幽门螺杆菌(Hp)感染在治疗特发性血小板减少性紫癜(ITP)中的作用.方法 86例ITP患者进行Hp检测,对Hp阳性患者在原治疗方案基础上加用根除Hp治疗,监测血小板数的恢复情况.结果 25例Hp阳性的ITP患者在治疗ITP同时加用抗Hp治疗与对照组的25例Hp阳性的ITP患者的血小板数比较差异有统计学意义(P<0.05).Hp根除后血小板数恢复明显.结论 Hp感染是ITP诸多发病因素
工程总承包发展现状  工程总承包企业  工程总承包不同于施工总承包。施工总承包企业可以没有与项目相匹配的设计队伍,但工程总承包企业必须拥有与项目相匹配的设计队伍。
目的探讨经产妇自然分娩后轻度压力性尿失禁电刺激治疗的临床效果。方法选取唐山市妇幼保健院2016年1—10月间收治的自然分娩的经产妇于产后42d伴轻度压力性尿失禁的患者73例