一、开采现状弓长岭铁矿老岭露天采场于1968年开始小规模开采。1973年扩建设计的第一期开采境界标高为232米,第二期开采境界标高为112米,露天采场封闭口标高为256米。设计的运输公路布置在上盘固定帮,公路呈折返线布置形式。设计年产矿石为80万吨,剥岩为850万吨,采剥总量为430万吨,剥采比为4.4。设计采用2台牙轮钻穿孔,3台4米~3电铲装车,40台T-20型汽车运输。
First, the mining status Gongchangling iron ore Laoling open pit in 1968 started a small-scale mining. In 1973, the first phase of the expansion design was at a height of 232 meters. The elevation of the second phase was 112 meters and that of the open mouth was 256 meters. Design of the transport road layout in the fixed plate to help the road was arranged in the form of return line. Design annual output of 800,000 tons of ore, stripping rock 8.5 million tons, mining the total amount of 4.3 million tons stripping, stripping mining ratio of 4.4. The design uses two cone drill perforation, three 4 ~ 3 electric shovel loading, 40 T-20 type car transport.