论文部分内容阅读
针对株洲冶炼厂新建氧化锌浸出系统投产后存在的技术问题,本文分析了其原因、提出了改进措施,并阐述了整改效果和测试结果。
Aiming at the technical problems after the new zinc oxide leaching system was put into production in Zhuzhou Smelter, this paper analyzes the reasons and puts forward the improvement measures, and expounds the rectification effect and the test results.