The role of Pacific water in the dramatic retreat of arctic sea ice during summer 2007

来源 :Chinese Journal of Polar Science | 被引量 : 0次 | 上传用户:ayin2
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A model study is conducted to examine the role of Pacific water in the dramatic retreat of arctic sea ice during summer 2007.The model generally agrees with the observations in showing considerable seasonal and interannual variability of the Pacific water inflow at Bering Strait in response to changes in atmospheric circulation. During summer 2007 anomalously strong southerly winds over the Pacific sector of the Arctic Ocean strengthen the ocean circulation and bring more Pacific water into the Arctic than the recent(2000-2006) average.The simulated summer(3 months) 2007 mean Pacific water inflow at Bering Strait is 1.2 Sv,which is the highest in the past three decades of the simulation and is 20%higher than the recent average.Particularly ,the Pacific water inflow in September 2007 is about 0.5 Sv or 50%above the 2000-2006 average.The strengthened warm Pacific water inflow carries an additional 1.0×10~(20) Joules of heat into the Arctic,enough to melt an additional 0.5 m of ice over the whole Chukchi Sea.In the model the extra summer oceanic heat brought in by the Pacific water mainly stays in the Chukchi and Beaufort region,contributing to the warming of surface waters in that region.The heat is in constant contact with the ice cover in the region in July through September.Thus the Pacific water plays a role in ice melting in the Chukchi and Beaufort region all summer long in 2007,likely contributing to up to 0.5 m per month additional ice melting in some area of that region . A model study is conducted to examine the role of Pacific water in the dramatic retreat of arctic sea ice during summer 2007.The model generally agrees with the observations in showing seasonal and interannual variability of the Pacific water inflow at Bering Strait in response to changes During summer 2007 anomalously strong southerly winds over the Pacific sector of the Arctic Ocean strengthen the ocean circulation and more Pacific water into the Arctic than the recent (2000-2006) average. the simulated summer (3 months) 2007 mean Pacific water inflow at Bering Strait is 1.2 Sv, which is the highest in the past three decades of the simulation and is 20% higher than the recent average. Particularly, the Pacific water inflow in September 2007 is about 0.5 Sv or 50% above the 2000-2006 average .aked warm Pacific water inflow carries an additional 1.0 × 10 ~ (20) Joules of heat into the Arctic, enough to melt an additional 0.5 m of ice over the whole Chukchi Sea. In the model the extra summer oceanic heat brought in by the Pacific water mainly stays in the Chukchi and Beaufort regions, contributing to the warming of surface waters in that region. The heat is in constant contact with the ice cover in the region in July through September.Thus the Pacific water plays a role in ice melting in the Chukchi and Beaufort regions all summer long in 2007, likely contributing to up to 0.5 m per month additional ice melting in some area of ​​that region.
其他文献
摘要:本文结合工程实例论述了预应力混凝土管桩在建筑工程应用中的优势,并探讨了管桩施工中的一些关键问题及解决措施。作为一种相对成熟的工程产品,管桩已得到了广泛的应用,但其应用仍有一定的局限性。笔者认为预应力混凝土管桩的发展方向是大直径和改良拼接工艺,相信预应力混凝土管桩今后必将在建筑工程中得到更为广阔的应用。  关键词:预应力,管桩,施工,应用  Abstract: the soft soil fo
本文作者结合实际工作经验,分析介绍了桥梁过程中的几种常见混凝土病害,供同行参考。
摘要: 传统的工程项目管理模式已经不能适应新形势下工程管理和决策的需要。如何尽快实现新旧机制的转变,寻求与新形势相适应的工程项目管理模式,已成为一种共识和必然。研究基于工程项目进度控制的理论基础上,分析了现代项目进度管理的方法和手段,研究如何对输电迁改工程进度进行控制、跟踪和调整,提出了增强重视、加强管理体系建设等方法和建议。  关键词: 项目管理软件;电力工程建设;进度管理  Abstract:
This study investigates the Arctic Ocean warming episodes in the 20th century using both a high-resolution coupled global climate model and historical observati
南宋诗论家严羽笔下的《沧浪诗话》是最负盛名、对后世影响最大的一部诗话,全书系统性、理论性较强,是中国著名的诗歌理论著作.而它的第一部分是“诗辨”,它主要是阐述理论观
作者针对高层住宅发生火灾的特点,在文章做出详细分析,供大家借鉴学习。
本文根据控制器的要求利用超高速集成电路硬件描述语言VHDL(Very High Speed Integrated Circuit Hardware Dcscription Language)[1]介绍了一种基于FPGA的双输入单输出模糊
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
本文作者介绍了无粘结预应力混凝土结构的特点,探讨了无粘结预应力混凝土楼板的施工技术,供同行参考。
摘要:本文以西宝客专小村隧道为例,着重介绍客专大断面黄土浅埋隧道在V级围岩段,采用三台阶预留核心土开挖法快速穿过大变形段施工措施。  关键词:黄土;隧道;三台阶; 预留核心土; 沉降;裂缝;安全距离; 措施  Abstract: this article with the XiBao guest designed small village tunnel as an example, this p