Non-Oriented Fe-Si Thin Strip Produced from Grain Oriented Fe-Si Strip by CSR

来源 :Journal of Iron and Steel Research(International) | 被引量 : 0次 | 上传用户:yjsngmmsnjy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The grain oriented silicon strip was rolled by cross shear rolling(CSR)and then annealed to manufacture non-oriented thin silicon strip of high quality.The recrystallization of rolled grain-oriented silicon steel into non-oriented silicon steel was studied.For this purpose,CSR is better than conventional rolling,and the higher the mismatched speed rate is,the better the properties of the non-oriented thin silicon strip are.The optimum annealing schedule is heating at 1 000 ℃for 1hin pure hydrogen atmosphere added with H2 S of 0.001 0 %. The grain oriented silicon strip was rolled by cross shear rolling (CSR) and then annealed to manufacture non-oriented thin silicon strip of high quality. The recrystallization of rolled grain-oriented silicon steel into non-oriented silicon steel was studied. For this purpose , CSR is better than conventional rolling, and the higher the mismatched speed rate is, the better the properties of the non-oriented thin silicon strip are. The optimum annealing schedule is heating at 1 000 ° C. for 1 hin pure hydrogen atmosphere added with H2 S of 0.001 0%.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
Established in 1990, Baotou National Rare Earth Hi-Tech Industrial Development Zone was approved to be national high-tech zone by the State Council in 1992. It
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
在设备安装调试期间,由于工作人员的不良习惯会导致设备使用寿命大大缩短,尤其是泵类设备,将留下许多的隐患和危害,也会对后期的设备维护与保养造成较大的压力.本文对一些典
Comprehensively considering the factors such as descaling cooling,air cooling,water cooling,frictional heat and deformation heat in gap of every stand,heat cond
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊