潮白河双层橡胶坝技术研究,是紧密联系工程实践,对充水式双层坝袋结构进行了水工模型、水力学模型试验、数学模型的理论计算及锚固结构的试验研究,为工程设计提供了科学依据。该工程于1989年动工,当年建成。两年来运行正常,较好的发挥了工程效益,填补了我国橡胶坝4.1—5.0m坝高,100m以上坝长工程的空白(见封底照片),在橡胶坝建设规模及单项橡胶坝工程增加灌溉面积等方面有新的突破,拓宽了橡胶坝应用的范围。为建设较大型橡胶坝工程摸索了科研、设计、施工安装、运行管理等较全面的技术经验。
Chaobaihe double rubber dam technology research, is closely linked to engineering practice, water-filled double-layer dam structure of the hydraulic model, hydraulic model tests, mathematical model of the theoretical calculations and experimental study of anchoring structures for engineering design Provide a scientific basis. The project started in 1989, was completed. Two years of normal operation, the project has played a good performance, to fill China’s rubber dam 4.1-5.0m dam height, dam length of 100m above the project blank (see photos at the back cover), rubber dam construction scale and single rubber dam project to increase irrigation Area and other aspects of a new breakthrough to broaden the scope of the application of rubber dam. In order to build a larger rubber dam project groping scientific research, design, construction and installation, operation and management more comprehensive technical experience.