Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping Ⅱ hydro

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:happig101
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
According to site-specific environments such as high water pressures,high in-situ stresses and strong rockbursts,the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety.New drainage tunnels were considered.Furthermore,lining structures and grouting pressures were modified during the excavation of tunnels.The construction scheme was updated dynamically based on the complex geological conditions.For instances,the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction,and then by the combination method of tunnel boring machine(TBM)and drilling and blasting,and finally by drilling and blasting method.Through optimized scheme and updated construction scheme,the excavation of diversion tunnel #1 was successfully completed in June,2011.This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station.The experiences of design and construction obtained from this project could provide reference to similar projects. According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety .New drainage tunnels were considered.Furthermore , lining structures and grouting pressures were modified during the excavation of tunnels.The construction scheme was updated dynamically based on the complex geological conditions. Examples, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Based on optimized scheme and updated construction scheme, the excavation of diversion tunnel # 1 was successfully completed in June, 2011.This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Ji nping II hydropower station.The experiences of design and construction obtained from this project could provide reference to similar projects.
其他文献
目的探讨血清肿瘤标志物癌胚抗原(CEA)、CAl9-9、CA72-4和CA242在胃癌术后复发判断中的价值。方法 145例胃癌根治术后患者,术前检测血清CEA、CAl9-9、CA72-4和CA242,术后随访
随着节能减排形势变得日益严峻,相关部门对卡车超载的治理越来越严,轻量化成了近几年来汽车行业常被探讨的话题。比如,铝合金车轮的应用就是国内准重载车辆实现轻量化的一大
本文研究接受磺酰脲类治疗的超重、肥胖2型糖尿病代谢控制稳定患者用西布曲明(Sibutramine)和饮食疗法能否减轻体重和人体测量尺寸 ,并评价血糖浓度、有关代谢变量和药物耐受性。方法 
“和谐”是当今世界的主旋律。和谐,包括和谐社会、和谐国际、和谐家庭、人权民生、经济合作、环保节能、野生动物保护、种族歧视、妇女儿童、科技发展等等方面,现在地球上22
银行与证券分业管理的问题讨论多年了,1995年国务院有关文件还专门做了要求,但是实施结果却不如人意。从银行已有的证券机构来看,有的效益好,自己不肯“嫁”,有的家底差,券
采用高密度电法、地质雷达和瞬态瑞雷面波三种方法对江西某矿山尾矿坝进行综合勘察,结合相关地质情况和坝体结构特征,推断出隐患的性质、产状和埋深等情况;在分析尾矿坝浸润
以Thieno[3,2-b]thiophene(TT)为电子供体(D),Benzo[c][1,2,5]thiadiazole(BT)、[1,2,5]thiadiazolo[3,4-g]quinoxaline(Td Q)、和Benzobis[1,2,5]thiadiazole(BBT)为电子受
3月30日,安徽省省长王三运到省物价局调研视察。在听取了省物价局的工作汇报后,王三运指出:近年来,安徽省物价工作面临多方面的压力,主要是价格波动关联度比较高、全省恩格尔
绿源新型建材设备:节能降耗真省钱主要产品:建筑用新型外墙复合保温板及设备、轻质隔墙板及设备、水泥粉煤灰复合夹芯墙板生产线、无机玻璃钢保温板及设备、大 Lvyuan new b
From July until November in 2010,which totals up to almost four months,I was employed as a“student ambassador”at the United States Pavilion at the Shanghai Wo