石泉水电站位于汉江石泉县城上游1km陕谷处,坝高65m,库容4.7亿m~3,装机135万kW,1973年12月第一台机组发电,1975年7月土建基本建成,全部机组安装完毕.汉江洪水峰高量大,若下泄19400~20400m~3/s的洪水,其单宽流量可达142.4~156.9m~3/s,鉴于泄洪建筑物单宽流量大,设计上否定了鼻坎挑流和而流消能方式,而在我国水电建设上第一次采用了消力戽消能型式.通过十多年来实际运用,总结其特点和经验十分必要.
The Shiquan Hydropower Station is located at 1km upstream of the Shiquan County in the Hanjiang River. The dam is 65m high with a storage capacity of 470 million m 3 and installed capacity of 1.35 million kW. The first generating unit was produced in December 1973 and basically completed in July 1975. All the units were installed The flood peak height of the Hanjiang River is large, and if the flood of 19400 ~ 20400m ~ 3 / s is discharged, the single-wide flow can reach 142.4 ~ 156.9m ~ 3 / s. But it is the first time to use the dissipative energy dissipation mode in hydropower construction in our country.It is necessary to summarize its characteristics and experience through practical application in more than a decade.