The class B radiochemical laboratory was rebuilt in 2011, the areas of laboratory is about 120 m2 with four partitions, which includes White, Green, Orange and
1 Introduction In order to ensure more reliability in reactor running,different passive shut-down systems have been studied in recent years.One method uses ma
On the basis of the stage commissioning and improving the safety rod last year, the test of the new safety rod driving systems in CARR showed that the performan