1 工程施工情况盘石头水库输水洞工程为有压输水洞,洞内钢筋混凝土部分长315m,按设计要求受力钢筋必须焊接,不允许搭接,钢筋接头量大,钢筋型号多,Φ14~Φ28等6种型号受力钢筋。根据本工程特点,施工中洞内钢筋接头连接若采用电焊、气压焊、电渣压力焊时,无法及时解决洞内排烟,且焊接时间长,施工场地狭小,处理不好,会影响到洞内施工人员的人身健康和安全,影响工程进度,故在本工程钢筋接头施工中,首先考虑用钢筋连
1 Construction conditions Panshitou reservoir water tunnel project is pressurized water tunnel, reinforced concrete part of the cave length 315m, according to the design requirements of the reinforced bar must be welded, not allowed to lap, a large amount of steel joints, steel models and more, Φ14 ~ Φ28 and other six types of reinforced bar. According to the characteristics of the project, if the connection of steel bar joints in the tunnel during construction is welding, gas pressure welding or electro-slag pressure welding, the exhaust smoke inside the tunnel can not be solved in time and the welding time is long, the construction site is small and the treatment is not good, The personal health and safety of the internal construction workers affect the progress of the project. Therefore, in the construction of the steel bar joints in this project,