论文部分内容阅读
在我国,开发建设项目移民安置工程基本上都是交由地方政府组织实施,水土流失防治责任也相应转移给地方政府。但实际上,由于治理项目点多、面宽、分散,治理资金不足,技术局限等原因,导致移民安置区水土流失防治工作并未得到真正落实,水土流失问题仍然严重。实行代建制,选择有资质的专业项目管理单位代为治理,可以有效解决上述问题,值得推行。以龙滩水电站贵州库区移民安置工程为例,分析了水土保持治理项目推行代建制的必要性。
In our country, resettlement projects of development and construction projects are all basically handed over to local government organizations for implementation, and the responsibility for soil and water loss prevention and control is also transferred to local governments accordingly. However, in actuality, the prevention and control of soil and water loss in resettlement areas has not been fully implemented due to many administrative areas such as wide and scattered management, insufficient funds for management and technical limitations, and the problem of soil and water loss is still serious. Implementation of agency system, choose a qualified professional project management unit on behalf of governance, can effectively solve the above problems, it is worth promoting. Taking the project of resettlement in Longtan Hydropower Station in Guizhou Province as an example, the necessity of implementing agency system in soil and water conservation project is analyzed.