论文部分内容阅读
陇驾庄水文站位于门头沟区妙峰山乡陇驾庄村,建于1958年12月,距三家店引水枢纽工程约11km。日常掌握下苇甸电站的发电放水过程,定时向三家店引水枢纽汇报上游水情,以指导三家店引水枢纽的供水调度。在汛期,监测洪水全过程,并及时向三家店引水枢纽汇报上游洪水水情,指导三家店引水枢纽的防洪调度。通过利用大量实测水文资料,分析相应关系,可以更好发挥陇驾庄水文站对三家店引水枢纽的水情预报作用。
Longjia Zhuang hydrological station is located in Mentougou Miaofeng Hill Township Longjia Village, was built in December 1958, from the Sanjiandi Diversion Project about 11km. Daily grasping the power generation and drainage process of WeiDian Power Station, reporting the upstream hydrological conditions regularly to the Sanjian Diversion Project to guide the water supply dispatch of the Sanjian Diversion Project. During the flood season, the whole process of flood monitoring was monitored, and the upstream flood situation in Sanjiadian water diversion hub was promptly reported to guide the flood control dispatch of the Sanjiadian water diversion hub. By using a large amount of measured hydrological data and analyzing the corresponding relationship, it is possible to make better use of the hydrological forecast of Longjiazhuang Hydrometric Station to the Sanjiandi Diversion Project.