(上接第3期第30页)软土地基不能直接夯打8月2日星期五晴主厂房柱基土方和锅炉基础土方经过一个多星期的紧张施工,还有40cm就到达设计标高位置了,下午开始用人工清理坑底土方。下午4时,赵工程师来工地检查工作,临走时,特地关照一句话,挖到设计标高后,及时请勘?
(Continued from page 3 on page 30) can not be directly rammed soft ground Friday, August 2 Qing master plant pillars earthwork and boiler foundation earthwork after more than a week of intense construction, there are 40cm to reach the design elevation position, In the afternoon, we started to clean the pit bottom by hand. 4 o’clock in the afternoon, Zhao engineers to the site inspection work, before leaving, specially care a word, dug design elevation, the timely investigation?