论文部分内容阅读
WJ901053 西德迪林根钢厂转炉车间增设钢包除气设备——《Steel Times》,1988,№5,vol12,(英)联邦德国迪林根钢厂在185t转炉炼钢车间增设了钢包除气设备,其目的是降低钢中氢、氧、硫、氮等气体含量。文中介绍了设备设计和设备运行情况。真空脱气设备中包括4级真空泵。氧枪吹氧速率25Nm~3/min。采用VOD工艺。过程控制计算机采用48K存储器,被它控制的系统有:脱气制度、惰性气体搅拌、合金化及数据存入。
WJ901053 Steel Ladle Deaeration Plant Added to Converter Plant in West Dillingen - Steel Times, 1988, No. 5, vol12, (UK) The German Linden mills added ladle gas removal equipment to a 185-ton BOF steelmaking plant for the purpose Is to reduce the steel hydrogen, oxygen, sulfur, nitrogen and other gas content. The article describes the equipment design and equipment operation. Vacuum degassing equipment includes 4 vacuum pumps. Oxygen gun oxygen blowing rate 25Nm ~ 3 / min. VOD process. Process control computer using 48K memory, it is controlled by the system: degassing system, inert gas mixing, alloying and data storage.