论文部分内容阅读
本文着重介绍高明大桥主桥箱梁0~1#块施工的有关技术工艺,重点阐述在箱梁的常规施工中如何确保结构的外观质量,减少混凝土的裂缝产生.
This article focuses on the construction of 0 ~ 1 # block of the main bridge girder of the Gaoming Bridge, and focuses on how to ensure the appearance quality of the structure and reduce the cracks in the concrete during the normal construction of the box girder.