论文部分内容阅读
本项研究重点对地下水库建库研究成果作了介绍,其成果有,地下水库水资源量计算应用参数成果、地下坝设计孔距计算及板墙厚度计算应用公式成果、地下水库不同回灌工程补给强度成果(建闸蓄水回灌)、地下坝物理力学指标成果、地下建库预期目标及完成情况,并结合建库设计需要,首次提出了建库设计水源计算以及高喷建坝设计计算应用的变参方程,解决了建库供水水源计算以及高喷建坝设计计算的难题,为滨海平原缺水地区供水开源兴建地下水库提供了科学依据及建库方法.
The research focuses on the research results of the construction of underground reservoirs. The achievements include the results of application and calculation of underground water resources, the calculation of the design hole spacing of underground dams and the calculation formula of wall thickness, Supply strength results (floodgate built water storage and recharge), the results of physical and mechanical indicators of underground dams, the target and completion of the underground reservoir construction, combined with the design of the reservoir construction, for the first time put forward the design of reservoir construction design and high-jet dam design and calculation Varying parameters equation is applied to solve the problem of calculating the water supply of building reservoir and the design and calculation of high-pressure jet dam construction. It provides a scientific basis and a database for the construction of underground reservoir by water supply and open source in water-scarce areas of coastal plain.