A numerical method for determining the stuck point in extended reach drilling

来源 :Petroleum Science | 被引量 : 0次 | 上传用户:mingxing10192009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A stuck drill string results in a major non-productive cost in extended reach drilling engineering.The first step is to determine the depth at which the sticking has occurred.Methods of measurement have been proved useful for determining the stuck points,but these operations take considerable time.As a result of the limitation with the current operational practices,calculation methods are still preferred to estimate the stuck point depth.Current analytical methods do not consider friction and are only valid for vertical rather than extended reach wells.The numerical method is established to take full account of down hole friction,tool joint,upset end of drill pipe,combination drill strings and tubular materials so that it is valid to determine the stuck point in extended reach wells.The pull test,torsion test and combined test of rotation and pulling can be used to determine the stuck point.The results show that down hole friction,tool joint,upset end of drill pipe,tubular sizes and materials have significant effects on the pull length and/or the twist angle of the stuck drill string. A stuck drill string results in a major non-productive cost in extended reach drilling engineering. The first step is to determine the depth at which the sticking has occurred. Methods have been verified useful for determining the stuck points, but these operations take considerable time. As a result of the limitation with the current operational practices, calculation methods are still preferred to estimate the stuck point depth. Current analytical methods do not consider friction and are only valid for vertical rather than extended reach wells. The numerical method is established to take full account of down hole friction, tool joint, upset end of drill pipe, combination drill strings and tubular materials so that it is valid to determine the stuck point in extended reach wells.The pull test, torsion test and combined test of rotation and pulling can be used to determine the stuck point. The results show that down hole friction, tool joint, upset end of drill pipe, tubular sizes and ma terials have significant effects on the pull length and / or the twist angle of the stuck drill string.
其他文献
桑干河流域的乡村太阳照在桑干河上,可是桑干河已经没有水。过了桑干河大桥不久,小公共汽车在一个叫做“揣骨疃”的小镇左拐。县级公路,却也平坦,乡野空旷,田亩阡陌纵横,右窗
天然产物结构复杂,生理活性独特,常被用作先导化合物,经过结构修饰和改造,发展为具有重要药用价值的化合物,在保障人类健康方面发挥重要的作用.近年来,具有独特立体结构、多
目前低渗透油田的多套油层或同层同时开采逐渐增多,但其开采方式尚未有详细的论证。运用数值模拟对油层或同层采取分层开采与合采的饱和度差别界限进行研究。对实际生产层位
1955年牙买加人 Hugh-Jones 及1959年印度尼西亚人 Zuidema 分别描述了后来称为丁型及 Z 型糖尿病的综合征。他们描述的病人不能归入任何一种已确定的糖尿病类型(IDDM 或Ⅰ
国内外学者对尿中各种微量蛋白分子的化学研究,对于阐明尿蛋白形成的生理及病理机制具有重要意义。1989年12月起我科用特异性酶联免疫(ELISA)法检测尿微量蛋白(Alb、IgG、Ig
变态反应(Allergy)一般是指机体再次受某种抗原刺激后产生的过强免疫反应,有的引起生理功能紊乱或组织损伤。通常将能激发变态反应的抗原性物质称为过敏原或变应原。1963年G
玻璃体结合蛋白(Vitronetin,VN)是一种与免疫系统的补体、血凝系统的抗凝血酶Ⅲ、纤溶系统的纤维蛋白溶酶原激活物抑制剂Ⅰ的功能有关的多功能细胞粘附因子,是细胞外基质的
肾病综合征激素疗法效果已被肯定,但长期应用可能带来严重的副作用。本文结合临床实践,对激素的大剂量冲击疗法和口服强的松每日疗法进行了回顾性分析。资料和方法1.一般资
In celebration of the Chinese lunar year of the snake, a great variety of cultural events have been presented in scenic spots managed by Qujiang Culture and Tou
我院内科于1989年4月14日和19日分别收治1例患者,其主诉与症状相似,两患者均因关节痛在本市某医院就诊,并给予马钱子丸。患者误将2丸一次看成20丸一次服下。半小时即感头昏