4.2游泳池反应堆(SPR)l995年度运行概况储绍初本堆今年继续承担裂变Mo-Tc靶件和同位素辐照生产以及单晶硅掺杂等任务。4.2.1运行情况1995年安全运行29天,释放能量92.1MW·d。每月运行情况见表1。高功率开堆(功率在1MW以上)6次...
4.2 Pool Reactors (SPRs) The first year of operation of the Holtek unit will be followed up with tasks such as production of Mo-Tc target and isotope irradiation and doping of monocrystalline silicon. 4.2.1 Operation The safe operation of 29 days in 1995, the release of energy 92.1MW · d. Monthly operation in Table 1. High-power reactor (power above 1MW) 6 times ...