论文部分内容阅读
2011年8月,王某购买了一套新住宅。因自己去外地办事便委托朋友雇佣张某进行装修。双方口头约定,对新房进行改水、改电,并将客厅的暖气管道掩埋在墙体内,材料由王某自己购买,劳务费2500元。15天后,张某按照王某的要求,完成了装修任务,王某验收后按约给付了劳务费。2011年10月,王某家卧室暖气活接处漏水,因王某未在家中居住,没有及时进行处理,卧室地板、床和
August 2011, Wang bought a new home. Because they go to the field to entrust a friend to hire Zhang for decoration. Both sides verbally agreed on the new house to water, electricity, and the living room buried in the wall of the heating pipe, the material purchased by Wang himself, labor costs 2,500 yuan. 15 days later, Zhang in accordance with the requirements of Wang, completed the decoration task, Wang acceptance after the payment of labor costs. October 2011, Wang bedroom home heating junction leaks, because Wang did not live at home, there is no timely manner, bedroom floor, bed and