以某实际工程为例,介绍了其工程概况,从施工顺序、开挖程序、降排水方法、质量控制四方面,分析了基坑工程施工质量控制要点,并阐述了基坑施工中容易出现的问题及相应的对策,为同类工程提供参考。
Taking an actual project as an example, the general situation of the project is introduced. The key points of construction quality control of the foundation pit project are analyzed from four aspects: construction sequence, excavation program, drainage and drainage method, and quality control. Problems and corresponding countermeasures, provide reference for similar projects.