四川省绵竹市土门镇中心小学及幼儿园项目是由江苏省常熟市援建的“5·12”震后重建项目。建筑受开学时间的限制,完工时间非常明确,时间紧迫的压力格外凸显。如何在有限的时间内完成高质量的建筑和工程设计,是灾区恢复重建项目中,设计人员无法回避且必须高度重视的问题。考虑到灾区恢复重建项目的特殊性,必须严格依照新制定的规范进行工程设计。同时,灾后恢复重建的建筑项目,必须是具有优秀建筑学品质的建筑作品,对美学和艺术价值的追求,不应因时间紧迫而稍有
Tumen Town, Mianzhu City, Sichuan Province, Central Primary School and Kindergarten Project is supported by Changshu City, Jiangsu Province, “5 · 12” post-earthquake reconstruction project. Construction by the opening hours of the time limit, the completion time is very clear, the stress of time constraints highlighted. How to accomplish high-quality architectural and engineering design within a limited time is a problem that designers can not avoid and must attach great importance to in the reconstruction and reconstruction of disaster areas. Taking into account the particularity of disaster recovery and reconstruction projects, engineering design must be carried out in strict accordance with the newly formulated norms. At the same time, the construction projects after the disaster recovery and reconstruction must be architectural works with excellent architectural quality. The pursuit of aesthetic and artistic values should not be delayed by time but slightly