近年来,随着广东省经济持续增长,降雨偏少,用电负荷增大,用电负荷需求不断达到历史新高,同时受西部严重缺煤少水导致西电减送、省内新机组投产容量不足等因素影响,全省电力供应能力严重不足,供应形势持续紧张。此外,系统备用容量长期处于临界、电网电源性缺电与结构性窝电并存的情况,大大增加了电网的调控难度。在此异常严峻的电力供应形势下,加强错峰用电管理,成为解决电力供应紧缺的重要手段。
In recent years, with the continuous economic growth in Guangdong Province, less rainfall, electricity load increases, the demand for electricity load continue to hit a record high, at the same time by a serious shortage of coal in the west caused by West less electricity, the province put into operation the capacity of new units Insufficient and other factors, the province’s power supply capacity is seriously inadequate, the supply situation continues to be tight. In addition, the standby capacity of the system is at a critical point for a long time. The coexistence of power shortage and structured power generation in the power grid greatly increases the difficulty of power grid regulation. In this extremely harsh electricity supply situation, to strengthen the management of wrong peak electricity, power supply has become an important solution to the shortage of power.