格里13号高炉9个月内喷煤量达到182kg/t铁[美]G.J.Sherman等1概况格里13号高炉从1993年3月开始喷煤。喷煤量在随后的9个月内一直不断增加,到1993年12月喷煤量已达到185kg/t铁(见图1)。喷煤量达到这样高的水平最重要的有...
Gerry 13 blast furnace coal injection within 9 months to reach 182kg / t iron [US] G. J. Sherman et al 1 Overview Grill No. 13 blast furnace from March 1993 began to spray coal. The amount of coal injected continued to increase over the next nine months, reaching 185 kg / t of iron by December 1993 (see Figure 1). Spraying coal to reach such a high level of the most important are ...