论文部分内容阅读
电力行业参与全国碳排放交易体系已成定局。对于电力企业而言,无疑又是新一轮的洗牌。9月的福建漳浦,东南季风盛行。放眼远眺,36台高达55米的风机,沿着蔚蓝色的海岸线一字排开。据现场施工人员介绍,六鳌地区正处于盛风期,风速达每秒15米以上,可支持风机满负荷发电。整个电场建设总容量是10万千瓦,已分三期建设完成。六鳌风电不仅为福建漳浦地区提供源源不断的清洁电力,也是我国首个在国际市场上取得成功的单边CDM项目。2006年7月27日,大唐六鳌一期0.6MW
It is a foregone conclusion that the power industry should participate in the national carbon emission trading system. For power companies, it is undoubtedly a new round of reshuffle. Zhangpu in Fujian in September, the prevalence of the southeast monsoon. With a glimpse into the distance, 36 wind turbines up to 55 meters in length are lined up along the azure coastline. According to on-site construction personnel, the Liuao area is in full swing with a wind speed of more than 15 meters per second, which can support fans to generate electricity at full capacity. The total electric field construction capacity is 100,000 kilowatts, has been completed in three phases. Liu’ao Wind Power not only provides a steady supply of clean electricity to Zhangpu, Fujian Province, but also is China’s first unilateral CDM project that has succeeded in the international market. July 27, 2006, Datang Liuao a 0.6MW